您现在的位置:建筑经济>>往期回顾>2016年>第8期>>文献要素
建筑物物化阶段碳足迹快速计算模型研究
李静 包昀培
(大连理工大学,辽宁 大连 116024)
文献要素
摘要:将物化阶段温室气体排放归结为建筑材料、施工机械、运输等三大碳足迹来源,以其构成建筑物物化阶段碳足迹,并基于BIM技术及《建筑工程消耗量定额》获取建筑的材料及机械工程量清单,运用碳足迹因子法计算三类碳足迹,形成建筑物物化阶段碳足迹计算快速模型。结合案例验证模型的正确性与可信性。
关键词:BIM技术;碳足迹;建筑物化阶段;快速计算
Abstract:This paper divides the source of greenhouse gas into three sources:building material carbon footprint,construction machinery carbon footprint,and transportation carbon footprint,to form the carbon footprint of the buildings during its construction phase. Then,based on BIM technology and the Building Construction Consumption Quota to obtain the bill of material and machinery quantities,calculates the three kinds of carbon footprints with the method of carbon footprint factors,forms the carbon footprint fast accounting model. Finally,verifies the accuracy and credibility of the established model by combining the actual example.
Keywords:BIM technology;carbon footprint;building construction phase;fast accounting
参考文献
[1] IPCC. Fifth Assessment Synthesis Report[R]. Cambridge University:UK New York,2014.
[2] 阴世超,建筑全生命周期碳排放核算分析[M].哈尔滨:哈尔滨工业大学,2012.
[3] 王建军,赵伟与王世亮,建筑物建造过程碳排放计算方法研究[J].建筑科学,2014(2).
[4] 陈婷婷,王宇.新型绿色建筑工程造价预算与成本控制分
析[J].工程经济,2015(7).
[5] 高源雪.建筑产品物化阶段碳足迹评价方法与实证研究[D].北京:清华大学,2012.
[6] Wiedmann. T,J. Minx. A Definition of Carbon Footprint[D].Resarch & Consulting,2007.
建筑经济,2016(08):87-91
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!