发包人拖延支付进度款引起的利润索赔研究—基于2013清单规范
孙娜 杜亚灵 李杨
(1.天津理工大学管理学院,天津 300384;2.河南黄河勘测设计研究院北京分院,北京 100073)
文献要素
摘要:首先,通过对规范性文件的相关条款进行分析,得出当发包人拖延支付进度款时,承包人有权暂停施工和解除合同。其次,对这两种情况下承包人可索赔的利润进行分类:当暂停施工导致工期延误时,承包人可向发包人索赔机会利润;当暂停施工但无工期延误时,承包人可向发包人索赔新增利润;当合同解除时承包人可向发包人索赔预期利润。最后,分别给出这三种利润的计算方法,包括计算基数和利润率的
确定。
关键词:进度款;利润索赔;暂停施工;合同解除
Abstract:Firstly,the paper proves the rights of suspension of construction and rescission of contract by analyzing related clauses of documents. Then,classifies the profits which contractor can claim into three kinds under these two situations,including opportunity profit when suspension of construction lead to delay,new profit when suspension of construction lead to non-delay,expectation profit when rescission of a contract. Finally,gives calculation methods of claim profit respectively,including determination of the base of calculation and the rate of profit.
Keywords:interim payment;profit claim;suspend constructing;rescission of contract
参考文献
[1] 郝跃,刘玉明.我国工程建设领域拖欠工程款问题对策研
究[J].软科学,2005(5):83-88.
[2] 党伟.建筑工程承包商停工权权利属性分析[J].人民司法,2006:80-81.
[3] 元晓勇.国际工程承包中承包商对利润和总部管理费的索赔问题探讨[J].学术论坛,2008(8):99-104.
[4] 王红梅,沈杰.论承包商的利润索赔[J].建筑管理现代化,2009,23(2):113-115.
[5] 卜双双,宗志芳.工程索赔中的利润损失问题研究[J]安徽工业大学学报,2013,30(3):39-40.
[6] 段亚伟.建设工程合同利润索赔原理及其定量分析——基于承包人索赔角度[J].建筑经济,2009(6):14-17.
[7] Selles,M.E.S.,Rubio,J.A.C.,Mullor,J.R.. Development of a quantification proposal for hidden quality costs:applied to the construction sector[J]. Journal of Construction Engineering and Management,2008(12):749-757.
[8] 邓建生.索赔管理——施工企业不可忽视的增效手段[J].施工企业管理,1996(09):13-14.
[9] 杨光.浅议窝工索赔值的算法[J].水利水电工程造价,2003(3):54-56.
[10] 冯义刚,江威.工程索赔中人员、设备停、窝工费用补偿问题探析[J].四川水利发电,2012,31(3):56-58.
[11] 张化强,李宪.EPC项目索赔实践与体会——以非洲某国际工程项目为例[J].项目管理技术,2012,10(1):61-65.
[12] 常志成.施工索赔分析与应用研究[D].西安:西安建筑科技大学,2005
[13] 肖红.论预期违约中减损规则[J].社会科学,2007(5):118-120.
建筑经济,2016(03):41-46
下载地址