摘要:通过对国内EPC项目招标时点的研究和两阶段设计利益相关者的分析,揭示设计管理存在的利益悖论。基于价值共创理论构建DART-PDCA模型,给出两阶段设计管理中存在的利益悖论问题的相应对策建议,实现业主和总承包商的合作共赢。
关键词:EPC项目;设计管理;价值共创;DART-PDCA模型
Abstract:This paper reveals the interest paradox in design management by researching the bidding time of domestic EPC projects and analyzing the two-stage design stakeholder. Based on the theory of value co-creation,constructs the DART-PDCA model,and gives corresponding countermeasures and suggestions for the benefit paradox existing in the two-stage design management,so as to realize the win-win cooperation between the owner and the general contractor.
Keywords:EPC projects;design management;value co-creation;DART-PDCA model
参考文献
[1] 董旭.建设单位如何加强EPC项目的管理[J].天然气化工(C1化学与化工),2019(3):103-105.
[2] 李武,胡应德.EPC模式下水电项目投资控制管理之思考[J].人民长江,2018(24):32-35.
[3] 张洁,蔡虹,赵皎卉.网络虚拟环境下基于DART模型的顾客参与价值共创模式研究——以日本企业无印良品为例[J].科技进步与对策,2015(18):88-92.
[4] 王伍仁.EPC工程总承包管理模式探索及展望[J].中国勘察设计,2020(10):40-49.
[5] 张水波,杨秋波.国际EPC交钥匙合同业主方的设计管理[J].中国港湾建设,2008(5):63-66.
[6] 苑莉钗,张勋,岳嵩,等.油气长输管道EPC项目限额设计应用研究[J].现代化工,2017(9):218-220.
[7] 胡彪,孙文鹏,孙春玲.基于DART模型的EPC建设工程项目设计阶段价值共创研究[J].铁道标准设计,2014(4):126-130.
[8] 于晓田.业主视角下EPC总承包项目前期投资管控研究[D].天津:天津理工大学,2019.
[9] 林昕,孙春玲,吴逸男,等.价值共创视角下造价咨询企业客户关系管理创新研究[J].建筑经济,2017(10):96-100.
[10] 尹贻林,徐志超.工程项目组织中信任状态的发展与演进:中国管理情景下的探索性研究[J].管理工程学报,2017(2):74-83.
[11] Matin DM. Identifying the effective factors for cost overrun and time delay in water construction projects[J]. Engineering,Technology & Applied Science Research,2016(4):1062-1066.
建筑经济,2021(07):40-44