基于内容分析法的BIM设计阶段应用研究综述
王廷魁 邓兢兢 李骁
(重庆大学建设管理与房地产学院,重庆 400030)
文献要素
摘要:以外文数据库Web of Science、Scopus收录的八大项目管理领域知名期刊为文献来源,以BIM为搜索关键词,对搜索到的研究文献进行分类。以内容分析法为研究方法,对收集到的BIM设计阶段应用研究的文献进行文献来源、研究内容、研究趋势等方面分析,并提出目前在BIM设计应用方面的研究热点和趋势。
关键词:BIM;研究综述;内容分析法;设计阶段
Abstract:Taking the eight well-known journals in the field of project management embodied by foreign database of web of science scopus as literature sources,and BIM as search keywords,classifies the literature related to BIM research. Then,uses content analysis method to analyze the literature sources,research content and research trend of the collected BIM research. Finally,ultimately provides some summarized conclusions of BIM application trends and research hotspot.
Keywords:BIM;research review;content analysis method;design stage
参考文献
[1] Brilakis I,Lourakis M,Sacks R,et al. Toward automated generation of parametric BIMs based on hybrid video and laser scanning data[J]. Advanced Engineering Informatics,2010,24(4):456-465.
[2] Geyer P. Systems modelling for sustainable building design[J]. Advanced Engineering Informatics,2012,26(4):656-668.
[3] Jung J,Hong S,Jeong S,et al. Productive modeling for development of as-built BIM of existing indoor structures[J]. Automation in Construction,2014(42):68-77.
[4] P?tr?ucean V,Armeni I,Nahangi M,et al. State of research in automatic as-built modelling[J]. Advanced Engineering Informatics,2015,29(2):162-171.
[5] Penttil? H. Describing the changes in architectural information technology to understand design complexity and free-form architectural expression[J]. ITcon,2006(11):395-408.
[6] Al Hattab M,Hamzeh F. Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management[J]. Automation in Construction,2015(52):59-69.
[7] Lee J K,Lee J,Jeong Y,et al. Development of space database for automated building design review systems[J]. Automation in Construction,2012(24):203-212.
[8] Kaner I,Sacks R,Kassian W,et al. Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms[J]. Journal of Information Technology in Construction,2008(13):303-323.
[9] Lee S I,Bae J S,Cho Y S. Efficiency analysis of Set-based Design with structural building information modeling(S-BIM)on high-rise building structures[J]. Automation in Construction,2012(23):20-32.
[10] Cho Y S,Lee S I,Bae J S. Reinforcement placement in a concrete slab object using structural building information modeling[J]. Computer‐Aided Civil and Infrastructure Engineering,2014,29(1):47-59.
[11] Mobasher M E,Rashed Y F,Elhaddad W. BIM standards for automated BEM structural analysis and design of RC plates[J]. Journal of Computing in Civil Engineering,2015(4):15-54.
[12] Isikdag U. Design patterns for BIM-based service-oriented architectures[J]. Automation in Construction,2012(25):59-71.
[13] Sanguinetti P,Abdelmohsen S,Lee J M,et al. General system architecture for BIM:An integrated approach for design and analysis[J]. Advanced Engineering Informatics,2012,26(2):317-333.
[14] Rafiq M Y,Rustell M J. Building Information Modeling steered by evolutionary computing[J]. Journal of Computing in Civil Engineering,2013.
[15] Manrique J D,Al-Hussein M,Bouferguene A,et al. Automated generation of shop drawings in residential construction[J]. Automation in Construction,2015(55):15-24.
[16] Nath T,Attarzadeh M,Tiong R L K,et al. Productivity improvement of precast shop drawings generation through BIM-based process re-engineering[J]. Automation in Construction,2015(54):54-68.
[17] Leicht R,Messner J. Moving toward an ‘intelligent’shop modeling process[J]. Journal of Information Technology in Construction,2008(13):286-302..
[18] Suter G,Petrushevski F,?ipeti? M. Operations on network-based space layouts for modeling multiple space views of buildings[J]. Advanced Engineering Informatics,2014,28(4):395-411.
[19] Zhang S,Teizer J,Pradhananga N,et al. Workforce location tracking to model,visualize and analyze workspace requirements in building information models for construction safety planning[J]. Automation in Construction,2015(60):74-86.
[20] Liu H,Al-Hussein M,Lu M. BIM-based integrated approach for detailed construction scheduling under resource constraints[J]. Automation in Construction,2015(53):29-43.
[21] Isikdag U,Underwood J. Two design patterns for facilitating Building Information Model-based synchronous collaboration[J]. Automation in Construction,2010,19(5):544-553.
[22] Monteiro A,Mêda P,Martins J P. Framework for the coordinated application of two different integrated project delivery platforms[J]. Automation in Construction,2014(38):87-99.
[23] Oh M,Lee J,Hong S W,et al. Integrated system for BIM-based collaborative design[J]. Automation in Construction,2015(58):196-206.
[24] Geyer P. Systems modelling for sustainable building design[J]. Advanced Engineering Informatics,2012,26(4):656-668.
[25] Kassem M,Iqbal N,Kelly G,et al. Building information modelling:protocols for collaborative design processes[J]. Journal of Information Technology in Construction(ITcon),2014(19):126-149.
[26] Singh V,Gu N,Wang X. A theoretical framework of a BIM-based multi-disciplinary collaboration platform[J]. Automation in Construction,2011,20(2):134-144.
[27] Fernando T P,Wu K C,Bassanino M N. Designing a novel virtual collaborative environment to support collaboration in design review meetings[J]. Journal of Information Technology in Construction,2013(18):372-396.
[28] Dossick C S,Anderson A,Azari R,et al. Messy talk in virtual teams:Achieving knowledge synthesis through shared visualizations[J]. Journal of Management in Engineering,2014,31(1):401-414.
[29] Rebolj D,Fischer M,Endy D,et al. Can we grow buildings? Concepts and requirements for automated nano-to meter-scale building[J]. Advanced Engineering Informatics,2011,25(2):390-398.
[30] Heidari M,Allameh E,de Vries B,et al. Smart-BIM virtual prototype implementation[J]. Automation in Construction,2014(39):134-144.
[31] Liu Z,Osmani M,Demian P,et al. A BIM-aided construction waste minimisation framework[J]. Automation in Construction,2015(59):1-23.
[32] Liu S,Meng X,Tam C. Building information modeling based building design optimization for sustainability[J]. Energy and Buildings,2015(105):139-153.
[33] Cemesova A,Hopfe C J,Mcleod R S. PassivBIM:Enhancing interoperability between BIM and low energy design software[J]. Automation in Construction,2015(57):17-32.
[34] Cho Y K,Ham Y,Golpavar-Fard M. 3D as-is building energy modeling and diagnostics:A review of the state-of-the-art[J]. Advanced Engineering Informatics,2015,29(2):184-195.
[35] Azzi M,Duc H,Ha Q P. Toward sustainable energy usage in the power generation and construction sectors—a case study of Australia[J]. Automation in Construction,2015(59):122-127. 
建筑经济,2016(09):100-105
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!