建设工程施工合同的风险边界及其应用研究—基于合同状态补偿视角
尹贻林 王先红 杨旋
(天津理工大学管理学院,天津 300384)
文献要素
摘要:承发包双方在施工合同中对风险分担约定不明确,双方各执一词,导致工程价款纠纷时有发生。从合同状态补偿视角,在分析施工合同状态补偿机理的基础上,界定建设工程施工合同的风险边界,指出单价和总价合同存在两个风险边界,即物理边界和时间边界,并探讨施工合同风险超出边界时,合同发承包双方进行风险再分担的原则。以某医院综合住院部大楼工程价款结算的争议为例,说明建设工程施工合同风险边界的应用方法。
关键词:施工合同;合同状态;风险边界;风险再分担
Abstract:Provisions in the construction contract for the risk-sharing agreement is not clear,so both sides stick to its argument,the above reasons lead to frequent happening of the construction price disputes. From the perspective of contract status compensation,the paper defines the risk boundaries of construction contract on the basis of analysis of contract status compensation mechanism on the construction contract,points out that there are two risk boundaries in unit rate and lump sum contract,that is the physical boundary and time boundary,and discusses the principles of construction contract risk re-allocation beyond the boundaries. Finally,takes the dispute of a hospital inpatient building construction price settlement to illustrate the application method of construction contract risk boundaries.
Keywords:construction contract;contract status;risk boundary;risk re-allocation
参考文献
[1] 严敏,闫金芹,严玲.清单计价模式下施工合同风险再分担路径研究[J].建筑经济,2014(10):90-94.
[2] 杜亚灵,尹贻林.不完全契约视角下的工程项目风险分担框架研究[J].重庆大学学报(社会科学版),2012(1):
65-70.
[3] 陈得敢.FIDIC施工合同条件下不可抗力事件的风险防
范[J].工程经济,2015(10):91-95.
[4] 鞠春宇.建设工程固定总价合同纠纷处理与结算方式[J].工程建设方设计,2008(7):118-122.
[5] 董红利,姜玉林,白洁.FIDIC合同条件下工程量变更引起的合同价款的调整方法研究[J].工程经济,2015(3):18-23.
[6] Lam KC,Wang D,etal. Modeling risk allocation decision in construction contracts[J]. International Journal of Project Management,2007(25):485- 493.
建筑经济,2016(09):39-43
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!