您现在的位置:建筑经济>>《工程经济》往期回顾>2016年>第7期>>文献要素
机电安装工程工程量清单常见质量问题复核的注意事项—基于降低工程索赔视角
邢应会
(皖新文化产业投资集团有限公司,安徽 合肥 230051)
文献要素
摘要:机电安装专业固有的复杂性造成工程量清单质量难以保证。为减少清单瑕疵引起争议、索赔、成本难以控制,有必要对编制好的工程量清单进行复核。首先分析机电安装工程工程量清单常见的质量问题,并从清单是否漏项或多项、清单项目划分是否规范等方面提出清单复核方法及注意事项。
关键词:安装工程;工程量清单;项目特征;工程索赔
Abstract:Inherent complexity of mechanical and electrical installation professional,usually causes difficulty in guarantying the quality of engineering quantity list. In order to reduce dispute,claim and difficult cost control caused by list quality problems,it’s necessary to draw up project list for review. The paper firstly analyzes common quality problems in mechanical and electrical installation engineering quantity list. Then proposes the review methods and precautions from the perspectives of whether there is leakage or more items,list items divisions is standard or not,list project characteristic is complete and accurate or not,etc.
Keywords:installation project;bills of quantities;project characteristics;engineering claim
参考文献
[1] 住房和城乡建设部.GB50500-2013建设工程工程量清单计价规范[M].北京:中国计划出版社,2013.
[2] 孙琳琳,刘建新.新版建筑安装工程费项目组成解析[J].建筑经济,2015(12):45-47.
[3] 宓芸.浅谈安装工程预算的编制与结算的审核[J].建设监理,2012(8):36-37.
[4] 刘晓文.对完善现行工程量清单计价模式的思考[J].建筑经济,2014(4):65-67.
[5] 全国一级建造师执业资格考试用书.建设工程经济[M].北京:中国建筑工业出版社,2012.
[6] 马俊,刘中玮.浅析工程量清单计价模式下工程竣工结算审核中常见问题及应对[J].工程经济,2015(10):26-31.
[7] 顾素珍,霍佩珍.工程量清单质量问题及其成因分析[J].中国科技信息,2008(13):51-52.
[8] 张南榍.工程量清单计价应用的问题及对策[J].建设监理,2011(7):32-36.
工程经济,2016(07):19-22
下载地址