高速公路改扩建工程的施工定额水平模糊评价研究
谈兴琦 毛红日 刘颖
(长沙理工大学交通运输工程学院,湖南 长沙 410004)
文献要素
摘要:高速公路改扩建工程工艺复杂,限制性条件多,其施工定额水平受多方面因素影响。基于此,构建定额水平影响因素指标体系,运用IAHP确定因素权重,并结合模糊评判方法,对其施工定额水平进行综合评判;并以广清高速公路改扩建项目为例,分析该方法在高速公路改扩建工程的施工定额水平评价中的应用,为高速公路改扩建工程施工定额的修订提供参考。
关键词:高速公路;改扩建工程;施工定额水平;模糊评判法
Abstract:The technology of highway reconstruction is complex with lots of restrictive conditions,its construction quota level is affected by various factors. This paper builds index system of influencing factors in highway reconstruction project,determines the factor weights with IAHP method,and carries out the comprehensive evaluation towards construction quota level by combining with fuzzy evaluation method. Taking Guangqin highway reconstruction project as an example,systematically analyzes the application approach of above method in construction quota level evaluation in highway reconstruction project,provides reference for norm revision of construction quota level evaluation in highway reconstruction project.
Keywords:highway;reconstruction project;construction quota level;fuzzy evaluation method
参考文献
[1] 黄文杰,杨万强,张宇波.工程量清单计价模式下对建设项目国家定额水平的评定研究[J].项目管理技术,2008(3):24-27.
[2] 竹隰生,王舒琪.对我国计价定额市场化改革的思考[J].建筑经济,2015(4):55-58.
[3] 胡彩虹,杨孚安.交通部新版《公路工程预算定额》的测算分析[J].企业技术开发,2008(11):17-19+53.
[4] 胡建民.企业劳动定额水平评定的几点新思考[J].机械管理开发,1998(2):53-55.
[5] 武乾,宗一帆.旧工业建筑改造工程消耗量定额编制研究[J].建筑经济,2015(8):45-48.
[6] 屈承德.改进定额水平测算方法的探讨[J].水利水电工程造价,1999(2):34-35.
[7] 王首绪,郑秀珍,刘欲意,孙艺,杨静.基于IAHP灰色理论的公路工程劳动定额水平综合评价方法[J].长沙理工大学学报(自然科学版),2011(1):14-19+55.
[8] 马农乐,赵中极.基于层次分析法及其改进对确定权重系数的分析[J].水利科技与经济,2006(11):732-733+736.
工程经济,2016(05):09-12
下载地址