方案阶段结构成本的主要影响因素研究
(1.南开大学滨海学院,天津 300270;2.中国建筑设计院有限公司,北京 100044)
- 文献要素
-
摘要:建设项目方案阶段的若干结构相关影响因素对于项目最终结构造价具有至关重要的影响。依托典型工程案例,对项目方案阶段结构成本控制的主要因素逐一分析,重点研究抗震设防烈度、结构高度、结构体系选型3个主要影响因素对于方案阶段结构计算成本的影响效果,并据此提出相应的控制建议。关键词:建设项目;成本控制;结构成本;方案阶段;影响因素Abstract:Several structural factors during the planning stage in the construction projects play an important role in the whole structural cost. Based on several typical engineering cases,this paper analyzes the main factors that have impacts on structural cost controlling in planning stage. Especially,explores the impacting effect of the main factors of iseismic fortification intensity,structural height and structural system on structural cost controlling in planning stage,and puts forward the corresponding suggestions accordingly.Keywords:construction project;cost control;structural cost;planning stage;impacting factor参考文献[1] 住房和城乡建设部,等.建筑抗震设计规范(GB50011-2010)[S].北京:中国建筑工业出版社,2010.[2] 汪大绥,周建龙,包联进.超高层建筑结构经济性讨论[J].建筑结构,2012(5).[3] 李翀,冯维琦,吴泽.建设项目含钢量经济性理解与常见误区[J].建筑经济,2015(5).[4] 柳向东.建筑结构设计经济性控制流程[J].城市建筑,2015(12).[5] 王翔,王晓云,尹贻林.基于功能成本法的项目成本控制最优实现路径研究[J].建筑经济,2015(4).[6] 谢成钢.高层建筑剪力墙结构的经济性分析[J].建材技术与应用,2007(12).[7] 梁丽梅.两种住宅结构体系经济性的对比[J].价值工程,2011(30).[8] 宋良瑞.民用住宅建筑结构变化趋势分析与探究[J].工程经济,2015(5).建筑经济,2016(05):57-63