考虑成本与工期的总承包工程建设收益协调研究
(中油管道物资装备总公司,河北 廊坊 065000)
- 文献要素
-
摘要:以工程总承包商和采办服务商为研究对象,考虑采办服务商通过努力可以节余部分工程物资采购预算并同时可以压缩采购周期,利用收益共享理论和Stackelberg博弈理论,建立合作竞争关系下的激励模型,分别求出合作竞争关系下总承包商与采办服务商的最优决策,并分析不同参数对最优决策的影响。关键词:工程总承包;收益共享;Stackelberg博弈;最优决策Abstract:Taking the general contractors and procurement service providers as the research object,considers that the procurement service provider can cut down materials budget and reduce the procurement duration,builds the incentive model of cooperation and competition relationship by applying revenue sharing and stackelberg game. Then,respectively obtains the optimal decision of the general contractors and procurement service providers,analyzes the influence of different parameters on the optimal decision.Keywords:general contracting;revenue sharing;Stackelberg game;optimal decision参考文献[1] 王安宇,司春林.基于关系契约的研发联盟收益分配问题[J]. 东南大学学报(自然科学版),2007,37(4):700-705.[2] 管百海,胡培.联合体工程总承包商的收益分配机制[J].系统工程,2008,26(11):94-98.[3] Zheng,D X,Ng S T and Kumaraswamy M M. Applying a genetic algorithm-based multi-objective approach for time-cost optimization[J]. Journal of Construction Engineering and Management,2004,130(2):168-176.[4] 梁永宽,董震.试论EPC总承包项目采购成本控制[J].建筑经济,2008(S2).[5] 李江涛,高峰.浅谈国际EPC工程承包项目采办管理[J].中国市场,2010(32):47-49.[6] 邵必林,王方轻,吴琼.工程项目工期隐性成本控制模型研究[J].建筑经济,2014(1).工程经济,2016(03):68-72