电力建设企业PPP项目的风险识别和应对措施研究
巩玺
(中国电力工程顾问集团有限公司,北京 100120)
文献要素
摘要:首先梳理PPP模式在电力建设企业中应用情况,从政府、企业管理及市场引致的角度识别电力建设企业PPP项目的10种风险,并采用头脑风暴法、风险预测图法确定关键风险因素。然后以葛洲坝贵阳综合保税区PPP项目决策和设计阶段风险应对的实践经验为例,提出建立风险分担机制、完善决策流程等电力建设企业PPP项目风险的应对措施。
关键词:电力建设企业;PPP项目;风险识别;风险应对
Abstract:The paper combs the application situation of PPP mode in electric power construction enterprise,identifies 10 kinds of risks in PPP projects from the aspects of government,enterprise management and market,determines the key risk factors with brainstorming method and risk prediction diagram method. Then,takes the dealing experience in the decision-making and design stage in Gezhouba Comprehensive Bonded Zone of Guiyang as an example,proposes risk solutions for the power construction enterprises PPP projects,such as establishing the risk sharing mechanism,improving the decision-making process.
Keywords:power construction enterprise;PPP project;risk identification;risk solutions
参考文献
[1] 李丽红,朱百峰,刘亚臣.PPP模式整体框架下风险分担机制研究[J].建筑经济,2015(9):11-14.
[2] 王舒.基础设施PPP项目融资风险分担研究[D].重庆:重庆交通大学,2012.
[3] 李明哲.国外PPP发展动态述评[J].建筑经济,2014(1):5-8.
[4] 赖丹馨.基于合约理论的公私合作制(PPP)研究[D].重庆:重庆大学,2011.
[5] 黄恒振,周国华.公私合营(PPP)项目风险再分担问题研
究[J].建筑经济,2015(10):17-20.
[6] 唐兴,霖周军.公私合作制(PPP)可行性:以城市轨道交通为例的分析[J].学术研究,2009(2):60-65.
[7] 李林,刘志华,章昆昌.参与方地位非对称条件下PPP项目风险分配的博弈模型[J].系统工程理论与实践,2013,33(8):1940-1948.
[8] 曹聪.基于PPP融资模式的公路工程项目风险识别研究[J].重庆三峡学院学报,2013,29(3):75-78.
[9] 梁晴雪,胡昊,谢忻.国内外典型PPP项目案例研究及启
示[J].建筑经济,2015(9):26-30.
[10] 胡振,刘华,金维兴.PPP项目范式选择与风险分配的关系研究[J].土木工程学报,2011(9):139-146.
[11] Li B,Akintoye A,Edwards P J,Hardcastle C. The allocation of risk in PPP/PFI construction projects in the UK[J]. International Journal of Project Management,2005(1):25-35.
[12] Yongjian Ke,Shouqing Wang,etal. Understanding the risks in China’s PPP projects:Ranking of their probability and consequence[J].Engineering Construction and Architectural Management,2011(5):481-496.
工程经济,2016(02):75-80
下载地址