全过程审计模型在海外工程中的应用研究
(东北财经大学投资工程管理学院,辽宁 大连 116025)
- 文献要素
-
摘要:分析海外工程项目频频受挫的原因,基于全过程跟踪审计的四个阶段,提出涵盖控制有效性、受体易损性等因素在内的全过程审计模型。就模型的具体应用强调施工前审计的特殊地位和重要性,并建议成立统一的海外工程独立审计机构,通过提高工程项目的审计质量,为海外工程项目的顺利发展提供支持。关键词:海外工程项目;全过程跟踪审计;审计风险;控制模型Abstract:The paper analyzes the reason resulting in the failures of the oversea engineering projects and puts forward the whole process audit model involving the effectiveness of internal control and vulnerability of risk acceptor on the basis of the four stages of the whole process tracking audit. In the application of the model,the paper emphasizes the special role and the significance of pre-construction audit and advises to set up the independent overseas audit institutions,provides support for promoting the development of the oversea engineering projects by improving the quality of audit.Keywords:oversea engineering project;whole process tracking audit;audit risk;control model参考文献[1] Walid Belassi,Oya Icmeli Tukel. A new framework for determining critical success/failure factors in projects[J].International Journal of Project Management,1996(3):141-151.[2] 刘延宏,刘玉明.中国铁路产业“走出去”的经验与教训[J].建筑经济,2015(12):20-23.[3] 吴昊.浅谈海外工程项目审计的重点[J].财务与会计,2013(5):68-69.[4] 陈祥升.中海外波兰工程折戟对我国企业走出去的启示[J].对外经贸实务,2013(4):74-76.[5] 陆宁.国际工程承包项目失败因素的三角模糊数分析[J].价值工程,2011(25):63-64.[6] 衣长军,胡日东.我国企业海外投资风险预警与防范[J].商业时代,2006(32):23-24.[7] 刘宇红.浅谈如何做好工程建设项目跟踪审计工作[J].工程经济,2014(7):36-38.工程经济,2016(02):31-35