基于业主视角的建筑基坑工程造价控制要点
(1.赣州现代规划建筑设计有限公司,江西 赣州 342700;2.广东省水利水电科学研究院,广东 广州 510610;3.广东省岩土工程技术研究中心,广东 广州 510610;4.广东省突发公共事件应急技术研究中心,广东 广州 510610)
- 文献要素
-
摘要:基于业主视角,分阶段分析梳理基坑工程造价控制要点:工程项目策划阶段要组织多专业人员参与,尽量与周边地块协同开发;勘察设计阶段要重视勘察和原位测试、进行多方案比选、建立奖励机制以优化设计、进行基坑支护技术评审;施工阶段要求编制专项施工方案、加强施工过程巡查和施工质量监控。关键词:建筑基坑;工程造价;造价控制;全过程Abstract:Based on the perspective of the owners,this paper analyzes the key points of the cost control of the foundation pit. In planning stage,professicnals from different majors should participate and cooperate with surrounding land as soon as possible. In survey and design stage,project managers should pay more attention to the surveying and in-situ testing,compare various construction plans,optimize the designs by setting up a reward system,and hold foundation pit supporting technology reviews. In construction stage,project managers should compile special construction plan,strengthen supervision during the construction process.Keywords:building foundation pit;engineering cost;cost control;whole process参考文献[1] 刘国彬,侯学渊,黄院雄.基坑工程发展的现状与趋势[J].地下空间,1998(S1):32-33.[2] 刘国彬,王卫东.基坑工程手册[M].第2版.北京:中国建筑工业出版社,2009.[3] 周远忠,刘新荣,等.大型红粘土深基坑工程造价计算与控制分析[J].建筑经济,2014(6):55-58.[4] 伍宇进.上海地区浅基坑工程围护设计优化研究[J].工业建筑,2010(S1):680-685.[5] 韩兴旺.建筑工程造价预结算审核工作要点研究[J].工程经济,2015(4):38-42.[6] 邱亦工,姚传勤.现阶段常用深基坑支护方案技术经济分析[J].山西建筑,2007(25):120-121.[7] 王俊安.工程造价管理技术要点的重构[J].建筑经济,2015(2):77-79.[8] 屠毓敏.基坑支护结构设计的技术经济评价[J].岩土工程界,2000(3):26-29.[9] 陆油梦.超深地下连续墙造价控制策略研究[J].建筑经济,2015(5):61-63.[10] 杨光华,姜燕,等.确定地基承载力的新方法[J].岩土工程学报,2014(4):597-602.[11] 岳飞启.机场改扩建项目的施工管理[J].工程经济,2014(11):20-26.工程经济,2016(01):15-18