您现在的位置:建筑经济>>往期回顾>2016年>第2期>>文献要素
PPP项目控制权与现金流权的合理配置方法研究
孙燕芳 张晓璇 高宏洁
(1.中国石油大学(华东)经济管理学院,山东 青岛 266580;2.东方地球物理公司,河北 涿州 072751)
文献要素
摘要:借鉴公司制企业的经验,定义PPP项目控制权与现金流权的概念,分析导致某些PPP项目中控制权与现金流权分离的原因,基于避免两权分离的思路,构建以公共部门为控制人的PPP项目控制权与现金流权合理配置的概念框架,并提出实现合理配置的注意点,以期为解决剩余控制权配置问题提供理论参考。
关键词:PPP;控制权;现金流权;概念框架;不完全契约
Abstract:Learning from the experience of joint-stock companies,the paper puts forward the definition of control right and cash flow right for the PPP project,and analyzes the reasons for the separation of the two rights in some PPP projects. Then,builds the conceptual framework about the match of control right and cash flow right that taking the public sector to be the ultimate controller based on the thinking of avoiding the two rights separation. The paper points out things should pay attention to realize rational allocation of control right from the cash flow right,and provides theory reference for solving the problem caused by residual control right allocation.
Keywords:Public Private Partnership;control right;cash flow right;conceptual framework;incomplete contract
参考文献
[1] 孙慧,叶秀贤.不完全契约下PPP项目剩余控制权配置模型研究[J].系统工程学报,2013(4):227-233.
[2] 王雷,党兴华.剩余控制权、剩余索取权与公司成长绩效——基于不完全契约理论的国有上市公司治理结构实证研究[J].中国软科学,2008(8):128-138.
[3] 高峰,郭菊娥,赵强兵.基于障碍期权的基础项目政府担保价值研究[J].预测,2007(2):76-80.
[4] Cheah C Y J,Liu J C. Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation[J]. Construction Management and Economics,2006(5):545-554.
[5] Jun J. Appraisal of combined agreements in BOT project finance:focused on minimum revenue guarantee and revenue cap agreements[J]. International Journal of Strategic Property Management,2010(2):139-155.
[6] Ashuri B,Kashani H,Molenaar K R,et al. Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options[J]. Journal of Construction Engineering and Management,2012(4):545-557.
[7] Chiou Y C,Lan L W. Royalty models for build-operate-transfer transportation projects with uncertainties[J]. Transportmetrica,2006(3):175-197.
[8] Kang C. C.,Feng C. M.,Kuo C. Y. Comparison of royalty methods for build–operate–transfer projects from a negotiation perspective[J]. Transportation Research Part E:Logistics and Transportation Review,2012(4):830-842.
建筑经济,2016(02):27-30
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!