人工费异常波动引起的合同价格调整研究—以云南AH水电站为例
(天津理工大学管理学院,天津 300387)
- 文献要素
-
摘要:以云南AH水电站为例,对人工费异常波动引起的合同价格争议提出两条解决途径:一是采用调值公式调整,但保留对人工费涨幅过大所造成损失的索赔权;二是将人工费单独调整,但调值公式中将不再对人工费进行调整。研究结果显示,第二种途径更有利于合同履行和风险规避,但需事先在合同中约定人工费调整的风险责任归属以及调整方法。关键词:合同价款;人工费;异常波动;调整Abstract:Taking Yunnan AH hydropower station as an example,this paper points out two solutions for contract price dispute brought by abnormal price fluctuation of labor costs:One is using the pricing formula,but reserve the right to claim for losses caused by abnormal price fluctuation. The other is to adjust labor costs alone,but omit labor costs in price adjustment formula. The results show that the second way is more advantageous from aspects of contract implementation and risk avoiding,but risk liability and adjustment method of labor costs should be clearly declared in the contract.Keywords:contract price;labor costs;abnormal fluctuation;adjustment参考文献[1] 温馨,文靖,张飞涟.论物价波动引起的工程价格调整方法[J].铁路工程造价管理,2014,29(3).[2] 严玲,丁乾星,张笑文.不利物质条件下建设项目合同补偿研究[J].建筑经济,2015(11).[3] 陆晓春,李贺,尹贻林,邢世永.物价异常波动引起的固定价格合同工程价款调整的法律依据及处理方式[J].项目管理技术,2012,10(6).[4] 蔡利标.突发性事件引起的物价异常波动的对策思考[J].南方经济,2003(3).[5] 张红标,刘衍伟.建设项目人工费计价理论思考[J].建筑经济,2015(7).建筑经济,2016(01):52-56