您现在的位置:建筑经济>>往期回顾>2009年>第1期>>文献要素
EPC模式下工程设计阶段可施工性应用研究
严玲 孟繁丽 邵莹莹
(1.天津理工大学, 天津 300384;2.滨海高新区开发建设有限公司, 天津 300301)
文献要素

[摘 要] 可施工性对建筑产品的设计质量、施工的便利性以及高效性都有重要影响。通过对国内外可施工性研究的综述,从合同模式出发,对比分析了传统模式DBB与EPC总承包模式的设计组织过程,并提出EPC总承包模式对于解决可施工性问题所固有的优势。然后结合EPC模式的特点,给出EPC模式下工程设计阶段可施工性研究的基本步骤,以期推动可施工性思想在我国EPC工程项目中的应用。
[关键词] EPC模式;设计阶段;可施工性; 对比分析;合同激励;工作程序
Abstract: Constructability has an important impact on design quality of building products, convenience and efficience of construction. The research progress in constructability at home and abroad is reviewed. Based on the contract mode, this paper has a comparative analysis of organization design process between the traditional mode and EPC mode, and raises that EPC general contracting mode have inherent advantages to resolve issues of constructability. Due to the characteristics of EPC mode, it proposes the basic steps of constructability study in design phase, in order to promote its application to EPC projects in our country.
Key words: EPC mode; design phase; constructability; comparative analysis; contract incentives; working procedures
[参考文献]
[1]Kelly,J.R. Value analysis in early building design[J].E&FN Spon,1982(5):115-125.
[2]Russell, J., Gugel, J., Fadtke, M. Benefits of constructability: four case studies[M]. Austin,Tex:Construction Industry Institute,1992.
[3]Bambang Trigunarsyah. Constructability practices among construction contractors in Indonesia[J]. Journal of Construction Engineering and Management,2004(5):656-669.
[4]Franky W.H. Wong,Patrick T.I. Lam,Edwin H.W. Chan,et al. A study of measures to improve constructability[J]. International Journal of Quality & Reliability Management. 2007,24(6):586-601.
[5]Stuart D. Anderson, Deborah J. Fisher. Integrating constructability into project development: a process approach[J]. Journal of Construction Engineering and Management, 2000(2):81-88.
[6]Michael H. Pulaski, Michael J. Horman. Organizing constructability knowledge for design[J]. Journal of Construction Engineering and Management, 2005(4):911-919.
[7]Nonaka, I., Takeuchi, H. The knowledge creating company[M]. New York:Oxford University Press,1995.
[8]Michael H. Pulaski, Michael J. Horman, David R. Riley.Constructability practices to manage sustainable building knowledge[J]. Journal of Architectural Engineering, 2006(6): 83-92.
[9]孙继德,廖前哨. 建设项目的可施工性研究[J].同济大学学报,2002,30(8): 1001-1004.
[10]崔云静,王旭峰. 建设项目设计的可施工性研究[J].建筑施工,2007,29(7):559-561.
[11]张水波,陈勇强.国际工程总承包EPC交钥匙合同与管理[M].北京:中国电力出版社,2008:63.
[12]周红. EPC承包模式下可持续设计管理[J].基建优化,2006,27(1):76-79.
[13]张水波,杨秋波.国际EPC交钥匙合同业主方的设计管理[J].中国港湾建设,2008,10(5):63-66.
建筑经济,2009(1):93-96

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!