您现在的位置:建筑经济>>往期回顾>2009年>第1期>>文献要素
基于公共部门角度的PPP模式在我国发展的推动力研究
袁竞峰 李启明 邓小鹏 李先光
(东南大学建设与房地产研究所, 江苏 南京 210096)
文献要素

[摘 要] 本文旨在基于政府公共部门角度探寻推动和促进PPP模式发展的关键因素。通过对识别出的15个推动因素的问卷调查,确定出推动因素的相对重要性,运用多元统计因子分析方法,归纳出5个基于公共部门角度的我国PPP模式的关键推动力。正确理解关键推动力有助于提高政府和私营方在项目中的决策能力,并促使双方收益于长期的合同安排,从而为项目的成功奠定基础。
[关键词] 公私合营;推动因素;问卷调查;因子分析
Abstract: Aiming to report the perception of what drives the development of PPPs in China from the perspective of public sector, a structured questionnaire survey was conducted by focusing on 15 identified driving factors. 5 most important public sectors' purposes to adopt PPP are obtained according to the factor analysis built on the survey results. Appropriate understanding of important driving factors will provide a more informed basis for Chinese government and private sectors to make decision and collaborate through long term contractual arrangement to achieve value for money.
Key words: public private partnerships; positive driving factors; questionnaire survey; factor analysis
[参考文献]
[1]Chen, C., Doloi, H. BOT application in China: driving and impeding factors[J]. International Journal of Project Management, 2008, 26(4): 388-398.
[2]Chan, W. T., Chen, C., Messner, J. I.,et al. Interface management for China's build-operate-transfer projects[J]. ASCE: Journal of Construction Engineering and Management, 2003,131(6):645-655.
[3]Li, B. Akintoye, A., Edwards, P. J., Hardcastle, C. Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: findings from a questionnaire survey[J]. Engineering, Construction and Architecture Management, 2005, 12(2): 125-148.
[4]Chen, A., Subprasom, K. Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty[J]. Transportation Research Part A, 2007, 41: 537-558.
[5]Meng, X. Guarantees for contractor's performance and owner's payment in China[J]. ASCE: Journal of Construction Engineering and Management, 2002, 128(3): 232-237.
[6]Zhang, X. Q. Critical success factors for public private partnerships in infrastructure development[J]. ASCE: Journal of Construction Engineering and Management, 2005, 131(1): 3-14.
[7]Li, B. Akintoye, A., Edwards, P. J., Hardcastle, C. Critical success factors for PPP/PFI projects in the UK construction industry[J]. Construction Management and Economics, 2005, 23: 459-471.
[8]Kumaraswamy, M. M., Anvuur, A. M. Selecting sustainable teams for PPP projects[J]. Building and Environment, 2008, 43(6): 999-1009.
[9]Akintoye, A., Beck, M., Cliff, H.,et al. The financial structure of private finance initiative projects[C]. Proceedings: 17th ARCOM Annual Conference, Salford, 2001, 1: 361-369.
[10]Pessoa, A. Public-Private Partnerships in developing countries: are infrastructure responding to the new ODA strategy?[J]. Journal of International Development, 2008(20):311-325.
[11]Salman, A. F. M., Skibniewski, M. J., Basha, I. BOT viability model for large-scale infrastructure projects[J]. ASCE: Journal of Construction Engineering and Management, 2007, 133(1): 50-63.
[12]Pett, N. A., Lackey, N. R., Sullivan, J. J. Making sense of factor analysis: the use of factor analysis for instrument development in health care research[M]. Sage Thousand Oaks: Publications Inc,2003.
[13]Zhang, X. Q. Factor analysis of public clients' best-value objective in Public- Privately Partnered infrastructure projects[J]. ASCE: Journal of Construction Engineering and Management, 2006, 132(9): 956-965.
建筑经济,2009(1):85-89

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!