城市轨道交通前期工程投资控制研究
边璐
(西安市地下铁道有限责任公司合同预决算处,陕西 西安 710018)
文献要素
摘要:概述城市轨道交通前期工程的范畴及特点,指出前期工程投资控制的重要性,结合西安市地铁工程实际,分析前期工程的投资控制现状及难点,提出前期积极介入、重视客流预测、规范招标工作、严审拆迁范围、规范过程管理等加强城市轨道交通前期工程投资控制的措施建议。 
关键词:城市轨道交通;前期工程;投资控制;计价依据 
Abstract :The paper summarizes the category and characteristics of the preconstruction of urban rail transit,points out the importance of the investment control of preconstruction . Combined with the practice of Xi’an Metro,analyzes the present difficulties and situation of the investment control of preconstruction,puts  forward that the investment control of preconstruction should be enhanced by the following aspect :getting involved from the early intervention,paying attention to the volume of passenger forecast,regulating the bidding procedure,strictly censoring the scope of resettlement and standardizing the process administration. 
Keywords:urban rail transit ;preconstruction ;investment control;valuation basis 
参考文献
[1] 杨博.城市轨道交通前期工程投资控制分析[J].建筑经济,2012(9):48-50.
[2] 王在虎.关于城市轨道交通中BT模式的投资控制分析[J].工程经济,2013(5):33-38.
[3] 马小燕,王英.城市轨道交通工程投资控制模式探讨[J].建筑经济,2013(8):33-34.
[4] 王燕,杜静,蔡朝.城市轨道交通BT项目的价款支付安排研究[J].建筑经济,2014(3):41-44.
 建筑经济,2015(12):51-54
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!