浅析最后计划者体系在施工生产管理中的应用
李明 韩同银
(石家庄铁道学院, 河北 石家庄 050043)
文献要素
[摘 要] 对最后计划者体系的基本原理和实施方法进行了阐述,分析了最后计划者体系与传统计划方法的区别与联系,指出我国建筑施工企业推行最后计划者体系方法尚存在的障碍。
[关键词] 最后计划者(LP),PPC,精益建造,生产管理
Abstract: According to discussion on the basic principle and implement method of last planner system, the paper analyzes the discrimination and relationship between the last planner system and traditional plan method. At last, it points out the difficulties of carrying out the last planner system in Chinese construction corporation at present.
Key words: the last planner; PPC; lean construction; production management
[参考文献]
[1]Glenn Ballard. The last planner system of production control[D].Birmingham: University of Birmingham, 2000.
[2]Mario Fiallo C., Victor Hugo Revelo P. Applying the last planner control system to a construction project: a case study in Quito, Ecuador[C]//10th Conf. of the Int. Group for Lean Construction, Brazil,2002.
[3]蒋书鸿,苏振民.精益建造:一种先进的建造体系[J].基建优化,2004,25(3):11-13.
[4]赵培,苏振民,金少军.精益建造中最后计划者体系的衡量及实践意义[J]商业时代,2008(4):48-49.
[5]陈勇强,张浩然.精益建造理论在工程项目管理中的应用[J].中国港湾建设,2007,150(4):74-76.
建筑经济,2008(12):104-107
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!