[摘 要] 在对国内外文献广泛阅读与分析的基础上,遵循风险分担的原则,对于PPP模式的主要43种风险因素在政府和私营机构之间进行了分担。并结合国内外典型PPP项目工程案例,对由政府承担、私营机构承担、双方分别承担和双方共同承担的各种风险因素进行了详细的分析。研究结论对于PPP项目在实际中的应用具有借鉴和指导意义。
[关键词] 公私营合作模式,风险分担,分担方式
Abstract: Based on a comprehenive review of international literatures, 43 major risk factors for PPP forms have been allocatded between public and private sectors according to the risk sharing principle. On the basis of some typical international PPP cases, various risk factors that may be shared by government and private sectors, respectively, or shared by all of them have been analyzed in detail. The result should be meaningful for promoting and guiding PPP projects.
Key words: public private partnership(PPP); risk sharing; sharing method
[参考文献]
[1]Lowe J, Whitworth T. Risk management and major construction projects, CIB W65(in conjunction with W92)[C]//International Symposium for the Organization and Management of Construction: Shaping Theory and Practice, Glasgow, Scotland, 1996.
[2]Frederick A. Entrepreneurial risk allocation in public-private infrastructure provision in South Africa[J]. South African Journal of Business Management, 2002, 33(4): 29-40.
[3]Zhang X Q, Kumaraswamy M M(a). Procurement protocols for public-private parternered projects[J]. Journal of Construction Engineering and Management,2001,126(3): 171-179.
[4]Zhang X Q, Kumaraswamy M M, Zheng W. Concessionaire selection for Build-Operate-Transfer tunnel projects in Hong Kong[J]. Journal of Construction Engineering and Management,2002,128(2):155-163.
[5]Lemos T, Eaton D, Betts M. Risk management in the Lusoponte concession-a case study of the two bridges in Lisbon, Portugal[J]. International Journal of Project Management,2004,22(1):63-73.
[6]Li B, Akintoye A, Edwards P J. The allocation of risk in PPP/PFI construction projects in the UK[J].International Journal of Project Management, 2005, 23(1): 25-35.
[7]邓小鹏. PPP模式的风险分担及对策研究[D]. 南京:东南大学,2007.
[8]邓小鹏.PPP模式风险分担原则综述及运用[J]. 建筑经济,2008(9): 32-35.
[9]Li B, Akintoye A, Edwards P J, et al. Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK[J]. Engineering, Construction and Architectural Management, 2005, 12(2): 125-148.
[10]Lam P T I. A sectoral review of risks associated with major infrastructure projects[J]. International Journal of Project Management,1999,17(2):77-87.
[11]Neal J. Financing of BOT project[D]. Singapore: Nanyang Technological University,1993.
[12]Wang S Q, Tiong R L K. Case study of government initiatives for PRC'S BOT power plant project[J]. International Journal of Project Management, 2000(18): 69-78.
[13]HM Treasury. Standardization of PFI contracts (3rd ed.)[S/OL].http://www.hm-treasury.gov.uk,2004.
[14]Zhang W R, Wang W Q, Tiong R.L.K. Risk management of Shanghai's privately financed Yan'an Donglu tunnels[J]. Engineering Construction and Architectural Management, 1998, 5(4): 399-409.
[15]Vega A O. Risk allocation in infrastructure financing[J].Journal of Project Finance, 1997, 3(2): 38-42.
[16]Humphreys I, Francis G, Ison S. An examination of risk transference in air transport privatization[J]. Transportation Quarterly, 2003, 57(4): 31-37.
[17]Arndt, Henry R. Risk allocation in the Melbourne city link project[J]. Journal of Project Finance,1998,4(3): 11-24.
[18]Rabinone D. Financing of BOT projects[D].Singapore: Nanyang Technological University, 1994.
建筑经济,2008(12):62-66
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!