DBB模式下建设项目信息粘滞成因及对策研究
柯洪 续金妍 吴绍艳
(天津理工大学管理学院,天津 300384)
文献要素
摘要:DBB模式下,由于阶段分析和目标差异等界面问题,导致大量信息滞留在组织内部或周围,直接制约着工程建设项目目标的实现。在已有研究的基础上,对信息粘滞的内涵进行界定,分别从不同主体之间的信息传输和不同阶段的信息传输等维度探讨工程建设项目中的信息粘滞现象,并分析成因,提出降低信息粘滞程度的对策。
关键词:DBB模式;建设项目;界面管理;信息粘滞
Abstract:Under the DBB model,the interface of the phase analysis and goal difference,lead to the retention of a large amount of information in the internal or surrounding tissue and directly restrict the realization of project objectives. In this paper,on the basis of the existing research,defines the connotation of information stickiness,respectively from the aspects of information transmission between different subjects and different stages of information transmission and discusses the common information stickiness phenomenon in the construction project,and offers the causes of objective stickiness and subjective stickiness,puts forward the countermeasures to reduce the degree of information stickiness.
Keywords:DBB model;construction project;interface management;information stickiness
参考文献
[1] Fellows R,Liu A M M. Managing organizational interfaces in engineering construction projects:Addressing fragmentation and boundary issues across multiple interfaces[J]. Construction Management and Economics,2012,30(8):653-671.
[2] 范红伟.信息不对称下的建设项目组织界面管理[J].重庆科技学院学报:社会科学版,2010(1):100-102+105.
[3] 路佩,简迎辉,刘博.建设项目设计界面管理对策研究[J].项目管理技术,2013(7):74-78.
[4] 向鹏成.基于信息不对称理论的工程项目风险管理研究[D].重庆:重庆大学,2005.
[5] 周瑞,沈杰,熊松.DBB承包模式与总承包模式下承包商的设计责任研究[J].建筑经济,2012(11):54-56.
[6] 李立新.大型建设项目设计界面的有效管理[J].建筑经济,2004(10):71-74.
[7] 杨瀚波.建设项目设计和施工界面管理的应用[J].建筑经济,2013(9):42-45.
[8] 刘芹,陈继祥.粘滞知识形成的影响因素及对策研究[J].情报科学,2007(5):776-779.
[9] 魏道江,李慧民,康承业.基于可拓策略生成的项目型内部知识转移途径研究[J].建筑经济,2014(3):109-112.
[10] 师立新.基于BIM技术的建筑供应链信息流管理的研究[D].南京:南京林业大学,2013.
建筑经济,2015(09):121-125
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!