基于功能成本法的项目成本控制最优实现路径研究
王翔 王晓云 尹贻林
(1.天津理工大学,天津 300384;2.北京恒诚信工程咨询有限公司,北京 100044)
文献要素
摘要:在建设项目的成本控制中存在两种传统思路,即被动控制下的成本纠偏和主动控制下的限额设计。以高星级酒店项目为例,提出主动与被动控制相结合的第三种成本控制思路,即在投资许可、设计理念、市场环境的三重制约下,运用利益相关者、敏捷制造、功能成本等理论与方法,实现项目成本、期望收益与项目价值,以期为相关的建设项目适应市场新常态进行成本控制提供参考。
关键词:成本控制;功能成本法;项目价值;利益相关者
Abstract:In terms of the cost control of the construction project,there exist two conventional ways of thinking,namely,the cost correction under passive control and the quota design under active control. Taking the projects of the high star-level hotel as the example,this paper proposes the third means of cost control by the integration of the active with the passive control,which means under the triple constraints of investment,design ideology and market,the tripod of project cost,expected benefit and project value will be achieved based on the theories and approaches such as stakeholders,agile manufacturing and function and cost method in order to provide the optimum path to realize the cost control of the construction project applicable to the new normal state of the market.
Keywords:cost control;function and cost method;project value;stakeholder theory
参考文献
[1] 高飞,翟斌.建设单位对建设项目投资的成本控制与管理[J].建筑经济,2013(7):45-47.
[2] 蔡辉旺,陶莉.限额设计下项目成本控制的探讨[J].建筑经济,2012(2):44-46.
[3] 尹贻林.从全过程造价管理到全生命周期造价管理[J].建筑监督检测与造价,2008(2):46-50.
[4] 孙莉.基于价值工程原理的项目成本控制研究[J].建筑经济,2014(9):56-59.
[5] 郝树人.现代饭店规划与建筑设计[M].大连:东北财经大学出版社,2004.
[6] 王红丽,崔晓明.你第一时间选对核心利益相关者了吗?[J].管理世界,2013(12):133-144,188.
[7] 熊伟,权靖雅,等.基于QFD的精装修房地产产品质量控制方法研究[J].建筑经济,2008(9):62-65.
[8] 高杰,薛彦涛,等.海口希尔顿逸林酒店消能减震抗震设计[J].建筑科学,2014(1):103-108.
建筑经济,2015(04):63-66
 
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!