设计-建造项目业主的质量管理研究(二)—基于全过程的质量管理方法
张尚 任宏 Albert P.C. Chan
(1.苏州科技学院,江苏 苏州 215011;2.重庆大学,重庆 400045;3.香港理工大学,香港)
文献要素
摘要:与DB项目工期和成本绩效研究的成果相比,其质量管理问题尚未受到理论研究的重视。为此,基于文献综述和FIDIC合同条件,从项目规划、采购、设计、施工和保修方面,针对识别的关键质量影响因素,提出DB项目的全过程质量管理方法,对业主提高DB项目的质量管理水平提供理论参考。
关键词:建筑业;项目业主;DB模式;质量管理;全过程
Abstract:In contrast to research on time and cost performance in design-build(DB)projects,the quality management topic of DB project has not been attractive to researchers in recent years. Based on literature review method and FIDIC conditions of contract,this paper summarizes practical quality management methods in light of the identified critical quality factors which can be used by DB employer all through project life-cycle stages,i.e. planning,procurement,design,construction and quality guarantee. The research findings provide practical guidance to the employer in improving design-build project quality level in China.
Keywords:construction industry;project employer;Design-Build model;quality management;whole process
参考文献
[1] J. Bourne,S. DeWitt,P. Drennon. Ensuring quality is built into the request for proposal process[R]. Washington,D.C:Transportation Research Board,2006.
[2] B. Carpenter,E. Fekpe,D. Gopalakrishna. Performance-based contracting for the highway construction industry:An evaluation of the use of innovative contracting and performance specification in highway construction[R]. Ohio:Final Report,2003.
[3] R. Carter,O. Tomeh,G. Darido,D. Schneck,F. Waesche. Quality assurance and quality control guidelines[R]. Washington,D.C:Department of Transportation,2002. 
[4] D.O. Cox,et al. Contract administration:technology and practice in Europe [R]. Washington,D.C:Federal Highway Administration,2002.
[5] D. D. Gransberg,E. Windel. Communicating design quality requirements for public sector design/build projects[J]. Journal of Management in Engineering,2008,24(2):105-110.
[6] Transportation Research Board. Quality assurance in design-build projects[R]. Washington D.C:Research Report,2008.
[7] J.K.Yates,L.C. Battersby. Master builder project delivery system and designer construction knowledge[J]. Journal of Construction Engineering and Management,2003,129(6):635-644.
[8] 国际咨询工程师联合会(FIDIC).生产设备和设计-施工合同条件[M].北京:机械工业出版社,2002.
建筑经济,2015(04):44-47
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!