工程造价管理技术要点的重构
王俊安
(天津商业大学,天津 300134)
文献要素
摘要:以工程项目为视角,对工程造价管理的技术要点进行重构。提出以建设单位为龙头,调动建设项目全体参与者;以实现节约项目一次性投资(建设期投入)和项目全寿命的经济性预期,力争项目参与各方利益最大化为目标,运用计划、组织、领导、控制等管理手段,对工程造价进行全过程、全方位、全要素和目标协同管理,以尽可能地降低工程造价,实现预定的经济效益。
关键词:工程项目;造价管理;技术要点
Abstract:From the perspective of construction project,reconstructs the essential technical points of project cost management. It is pointed out that should give top priority to owner and mobilize all the participants in project construction in order to bring about the expectation on fund-saving for both the total investment of construction project and the whole life cost of the project,adopt variety of management measures as planning,organizing,leading and controlling to manage the project cost in the entire process,all perspectives,whole factors and targets,to lower the project cost as much as possible and achieve the preconcerted economic efficiency.
Keywords:construction project;cost management;technical points
参考文献
[1] 刘任宏.建设工程成本计划与控制[M].北京:高等教育出版社,2004.
[2] 中国建设工程造价管理协会.GB50875-2013工程造价术语标准[S].北京:中国计划出版社,2013.
[3] Michael D. Dell,Isola. Architect’s essentials of cost management[M].New York:John Wiley & Sons,Inc,2002.
建筑经济,2015(02):77-79
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!