三代核电工程造价控制研究
(国家核电技术有限公司,北京 100029)
- 文献要素
-
摘要:阐述三代核电机组工程造价的基本概念、构成要素,就三代核电工程造价控制的有效途径问题,从宏观层面提出问题统一技术路线、推行标准化设计、实施国产化战略、规模化系列化发展及走专业化发展道路等策略,从微观层面提出合理缩短建造周期、推行招投标以引入竞争、充分利用国家三代核电自主化发展战略的成果和充分借鉴引用先进造价控制技术等控制造价的方法。关键词:建设工程;三代核电;造价分析;造价控制Abstract:Basing on the introduction of the basic concept,elements and others of Generation III nuclear power plants,this paper discusses on the effective methods to control the cost of Generation III nuclear power plants from both the macroscopic and microscopic aspects. From macroscopic aspects,this paper proposes strategies such as unifying the technology routes,promoting standardized design,implementing localization strategy,scale expansion and professional development,etc. From microscopic aspects,this paper proposes cost control methods such as properly shortening the construction periods,carrying out bidding system to introduce competition,adopting the achievement of Generation III Nuclear Power Plant self-reliance strategies,adequately using the advanced cost control techniques,etc.Keywords:construction project;generation III nuclear power plant;cost analysis;cost control参考文献[1] 张弘.浅谈核电工程设计阶段的投资控制[J].中国核电,2008(9).[2] 张胜利.国内商用核电站工程造价初步分析及进一步降低核电造价的对策研究[A]//中国核学会.2004中国核能论坛论文集[C].北京:中国核能工业出版社,2006:32-38.[3] 颜岩,郑宝忠,孙汉虹.核电建设全过程经验反馈机制的构建与运行[J].建筑经济,2014(9).[4] 陈衬兰.基于工程造价及发电成本的核电与火电比较研究[J].科技与管理,2005(4).[5] 杨光.低碳发展模式下中国核电产业及核电经济性研究[D].保定:华北电力大学,2010.[6] 康才品.海阳核电项目工程管理模式选择与实践[D].北京:北京交通大学,2009.[7] 初永军.电力工程造价控制与管理研究[D].保定:华北电力大学,2011.[8] 国家能源局.NB/T 20024-2010核电厂建设项目建设预算编制方法[S].北京:核工业标准化研究所,2010.[9] 国家能源局.NB/T 20023-2010核电厂建设项目费用性质及项目划分导则[S].北京:核工业标准化研究所,2010.[10] 国家能源局.NB/T 20025-2010核电厂建设项目工程其他费用编制规定[S].北京:核工业标准化研究所,2010.[11] 孙汉虹,程平东,缪鸿兴,等.第三代核电技术AP10000[M].北京:中国电力出版社,2010.建筑经济,2014(12):46-49