大型建设工程项目实施状态综合判定标准的分析与确定
(华北电力大学工程技术与管理研究所,北京 102206)
- 文献要素
-
摘要:针对大型建设工程项目实施状态诊断系统中项目实施状态综合判定标准方面存在的判据缺失问题,基于循证科学方法和kalman分析原理,通过对若干大型建设工程项目实际状态调查结果的科学分析与推证,获得了能够有效反映大型建设工程项目实施状态的综合判定标准,为科学判定大型建设工程项目实施状态提供科学的实证性依据。关键词:项目管理;大型项目;工程实施状态;判定标准;IMS诊断系统Abstract:To the problem of integration determinant standard in large-scale construction project,using the evidenced science and Kalman system analysis theory,a new integration determinant standard which can judge and mapping with construction real states is obtained based on the analysis of investigation result to construction practice. The achievement puts forward a more scientific rule for judging construction project implement state.Keywords:project management;large-scale project;construction implement state;determinant standard;ISM diagnosis system参考文献[1] 侯学良.基于循证科学的建设工程项目实施状态诊断理论与应用[M].北京:电子工业出版社,2010.[2] Hou Xueliang,Zhu hongliang. Analysis on group factors of engineering quality problems based on evidenced-management method[C]. MASS2009:1562-1568.[3] 李强.循证科学[M].北京:科学技术出版社,2010.[4] 郭宝柱.大型复杂技术项目的系统观点与系统工程方法[J].中国工程科学,2008,10(3):25-30.[5] 盛昭瀚,游庆仲. 综合集成管理:方法论与范式[J].复杂系统与复杂性科学,2007,4(2):1-9.建筑经济,2014(11):42-45