基于模糊识别的建筑工程安全危险源辨识与预防
(华北电力大学经济与管理学院,北京 102206)
- 文献要素
-
摘要:针对建筑工程中安全危险源多、难以辨识,导致大量工程事故发生的问题,运用模糊识别的方法,建立模糊识别的建筑工程安全危险源数学模型。在此基础上,利用大量的建筑工程数据,通过实时连续的信息采集,提取相应特征集,识别工程所处的安全状态,进而实现对工程安全危险源的辨识和预防。最后运用实例分析验证模糊识别在工程安全危险源辨识问题上的可行性。关键词:建筑工程;危险源;模糊识别;特征集Abstract:For many safety hazards,difficult to identify and resulting a large number of engineering problems of the accident,establishes mathematical model of fuzzy recognition construction safety hazards by using fuzzy recognition. Using a lot of architectural engineering data,collects real-time continuous information and extracts the corresponding characteristic set to identify security level,and thus realize the engineering safety hazard identification and prevention. Finally,proves fuzzy recognition to be feasible on the engineering safety hazard identification problem.Keywords:construction engineering;safety source;fuzzy recognition;characteristic sets参考文献[1] 田林钢,等.改进的模糊层次分析法在海堤工程安全评价中的应用[J].武汉大学学报,2013,46(3):317-320.[2] 姜慧,等.建筑工程安全事故致因分析及防控体系研究[J].建筑经济,2013(12):10-13.[3] 谢季坚,刘承平.模糊数学方法及其应用[M].第4版.武汉:华中科技大学出版社,2012.[4] 赵文芳,等.重大危险源定量风险评估实例解析[J].安全与环境学报,2013,13(5):239-243.[5] 侯学良.基于循证科学的建设工程项目实施状态诊断理论与应用[M].北京:电子工业出版社,2011.[6] 徐占鹏,尹启飞.模糊识别方法及其应用[J].电脑编程技巧与维护,2008(13).[7] 陈科荣.城市建设施工安全重大危险源辨识与防治[J].施工技术,2004,33(8):55-56.[8] Peng Wu,etc. Fuzzy recognition intelligent system based on cash character[J]. Advanced Materials Research,2013(748):675-678.建筑经济,2014(10):126-129