设计-建造总承包管理的国际研究进展(一)—基于文献统计与分析
张尚 任宏 Albert P.C. Chan
(1.苏州科技学院,江苏 苏州 215011;2.重庆大学,重庆 400045;3.香港理工大学,香港)
文献要素
摘要:由于设计-建造(DB)模式在节约工期、节省成本方面具有显著优势,已成为现代建筑业应用广泛的项目管理模式之一。本文查阅648篇关于DB总承包管理的英文文献,统计分析文献的时间序列和文献类型;采用内容分析法,识别这些文献的研究主题与研究方法;总结文献研究的参与方类型和项目类型。研究结果表明:1990~2009年间的DB文献最多;DB的各类文献中,期刊论文最多;DB文献最常用的研究方法是案例分析,最主要的研究主题是绩效,最关注的参与方是业主,最重视研究的项目类型是公共工程项目。研究结果为国内DB总承包管理的研究者提供参考和借鉴。
关键词:设计-建造模式;总承包管理;研究进展;文献综述
Abstract:Since design-build(DB)model has the advantages of time reducing and cost saving,it has become one of the most popular alternative delivery methods in modern construction industry. This paper collects 648 pieces of English literature on DB general contracting management;summarizes the chronology and type of the literature;uses content analysis method to identify the research topic and method of the literature;and explores the participants and type of the project studied by the literature. The research show that:on yearly basis,DB literature is mostly published during 1990~2009;journal papers have the most publications in terms of quantity;case study is the most popular research method;performance issues are the most important research topics;clients and public project are the focuses of the literature. The above findings provides guidance for researcher of DB general contracting management to carry out relevant research in China.
Keywords:design-build model;general contracting management;research progress;literature review
参考文献
[1] E. Palaneeswaran,M. Kumaraswamy. Contractor selection for design/build projects[J]. Journal of Construction Engineering and Management,2000,126(5):331-339.
[2] J. Bennett,E. Pothecary,G. Robinson. The industry today:Design and building a world-class industry[R]. United Kingdom:Center for Strategic Studies in Construction,1996.
[3] D.M. Darren. A Comparison of design-bid-build and design-build project delivery methods on military construction projects[D]. US:Iowa State University,2007. 
[4] T.R. Warne. Design build contracting for highway projects:A performance assessment[M]. LLC:Tom Warne & Associates,2005. 
[5] J. Prashant. Best bid identification in design-build contracting using game theory[D]. US:University of Texas at El Paso,2006. 
[6] K.R. Molenaar,S. Scott. Examining the performance of design-build in the public sector[M]. US:Aspen Law and Business,2003.
[7] D. Hale,P. P. Shrestha,G.E. Gidson Jr.,G.C. Migliaccio. Empirical comparison of design build and design bid build project delivery methods[J]. Journal of Construction Engineering and Management,2009,135(7):579-587.
[8] J.D. Fernane. Comparison of design-build and design-bid-build performance of public university projects[D]. Las Vegas:University of Nevada,2011.
[9] S. Pless,P. Torcellini,D. Shelton. Using an energy performance based design-build process to procure a large scale low-energy building[C]. US:ASHARE Winter Conference,2011.
[10] M. Konchar,V. Sanvido. Comparison of U.S. project delivery systems[J]. Journal of Construction Engineering and Management,1998,124(6):435-444.
[11] C.M. Tam. Design and build on a complicated redevelopment project in Hong Kong:The happy valley racecourse redevelopment[J]. International Journal of Project Management,2001(18):125-129.
[12] Y.Y. Ling,B.S. Y. Lau. A case study on the management of the development of a large-scale power plant project in east asia based on design-build arrangement[J]. International Journal of Project Management,2002(20):413-423.
[13] M.A.EI Wardani,J.I. Messner,M.J. Horman. Comparing procurement methods for design-build projects[J]. Journal of Construction Engineering and Management,2006,132(3):230-238.
[14] C.L.d. Puerto,D.D. Gransberg,J.S. Shane. Comparative analysis of owner goals for design/build projects[J]. Journal of Management in Engineering,2008,24(1):32-39.
[15] B. Xia,A.P.C. Chan,J.F.Y. Yeung. Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations[J]. Journal of Construction Engineering and Management,2011,137(12):1176-1184.
[16] E.W.M. Lam,A.P.C. Chan,D.W.M. Chan. Barriers to applying the design-build procurement method in Hong Kong[J]. Architectural Science Review,2006,49(2):189-195.
[17] A.P.C. Chan,D. Scott,E.W.M. Lam. Framework of success criteria for design/build projects[J]. Journal of Management in Engineering,2002,18(3):120-128.
[18] E.W.M. Lam,A.P.C Chan,D.W.M. Chan. Development of the design-build procurement system in Hong Kong[J]. Architectural Science Review,2004,47(4):387-397.
[19] D.D. Gransberg,R.F. Barton. Analysis of federal design-build request for proposal evaluation criteria[J]. Journal of Management in Engineering,2007,23(2):105-111. 
[20] E.W.M. Lam,A.P.C. Chan,D.W.M Chan. Determinants of successful design-build projects[J]. Journal of Construction Engineering and Management,2008,134(5):333-341. 
[21] D.D. Gransberg,K. Molenaar. Analysis of owner’s design and construction quality management approaches in design/build projects[J]. Journal of Management in Engineering,2004,20(4):162-169. 
建筑经济,2014(10):13-17