您现在的位置:建筑经济>>往期回顾>2014年>第5期>>文献要素
风电项目的经营策划实践
李鑫
(中国十七冶集团有限公司, 安徽 马鞍山 243061)
文献要素
[摘 要] 风电项目具有工期短、涉及专业多、不可预见因素多等显著特点。通过施工准备阶段的经营策划发挥主动控制的优势,确保目标成本的实现。从风电项目经营管理实际需要出发,总结借鉴有关行业经营管理成功经验,深入探讨经营策划的细节,旨在提高经营策划书编制的实用性、针对性和可操作性,真正实现经营策划对施工成本管理的指导性作用。
[关键词] 风电项目;经营策划;编制
Abstract: Wind power project has involved more than professional, short construction period, unforeseen by many factors other notable features. By construction preparation stage business planning play the advantages of active control, to ensure the realization of the target cost. In this paper, the actual wind power project management needs, summed learn from other successful industry management experience, in-depth study of the preparation of business planning details, designed to improve the practicality of business planning preparation, targeted and operable, the real business planning for construction cost management guiding role.
Key words: wind power project; business planning; implement
[参考文献]
[1]苗曙光.建设项目工程结算编审与筹划指南[M].北京:中国电力出版社,2009.
[2]徐瑞琴.送变电施工企业作业成本法、标准成本法、责任成本法的复合运用[J].财会月刊,2013(2).
[3]袁堂虎.施工企业二次经营中的成本管理方法探讨[J].经济师,2007(9).
[4]杨海青.浅谈前期施工策划与经营状况评估[J].水利水电工程造价,2013(1).
[5]王超.浅议项目施工中的“二次经营”——以兰渝项目为例[J].建筑经济,2012(3).
[6]石玉峰.电力施工项目成本管理与控制模型研究[D].保定:华北电力大学,2013.
建筑经济,2014(5):44-46
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!