大型电力工程项目资源冲突问题的调查与研究
高峰
(西安建筑科技大学管理学院, 陕西 西安 710055)
文献要素
[摘 要] 依据对我国52家电力在建工程调查结果,通过多元统计分析方法,描绘出电力工程项目中资源冲突在项目各阶段的分布规律,并对冲突的呈现特征做总结性阐述。同时,以全体资源冲突为总体,以电力工程项目中所含的四个阶段为子集合体,对电力工程项目资源冲突的总体分布状态及其数学特征参数进行数理分析。为项目管理者在工程实践中,把握项目全局并对项目资源进行统筹安排和优化管理提供实证性依据。
[关键词] 工程项目;资源冲突;分布规律;特征参数分析
Abstract: 52 projects have been investigated for obtaining a large amount of information of resource conflict. According to the information, the paper firstly sums up all kinds of resource conflict and its frequencies, describes their distribution rules in every stage by statistics; and then, explains their characteristics together with investigation results. Thirdly, the total distribution and mathematic characteristic parameters of resource conflicts have been analyzed according to sub-sample capacitances of all resource conflicts in four stages. It can be known that the research result will be a confirmatory evidence for project managers to control whole project at macro-angle, as well as planning and optimizing project management.
Key words: construction project; resource conflict; distribution rule; characteristic parameter
[参考文献]
[1]侯学良.冲突事件的随机性在工程项目中的表现形式[J].重庆建筑大学学报,2007(1).
[2]汪荣鑫.数理统计[M].陕西:西安交通大学出版社,2002.
[3]马庄国著.管理统计[M].北京:科学出版社,2002.
建筑经济,2014(4):51-53
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!