山区高速铁路项目施工成本管理探索
(中交第二公路工程局有限公司, 陕西 西安 710065)
- 文献要素
-
[摘 要] 阐述山区高速铁路项目工程特点,对成本管理的影响因素进行分析研究,从做好成本管理、科学合理地开展工程变更索赔工作、强化铁路项目施工成本管理等方面提出切实可行的成本控制的有效途径,为铁路工程项目成本管理创新和施工变更索赔管理实践提供参考。[关键词] 山区高速铁路;成本管理;索赔管理Abstract: This paper expounds the engineering characteristics of high-speed railway project in mountain region. Then analyzes the influencing factors of cost management. In the last part, from the cost management, carrying out project alteration and claim scientifically and reasonably, and strengthening the railway project construction cost management and other aspects, the paper proposes some effective means of cost control. These means provide useful references for the cost management innovation of railway engineering project and the management practice of change of project alteration and claim.Key words: mountainous high-speed railway; cost management; claims management[参考文献][1]林瑞峰.工程项目“两级”管理与成本控制[J].石家庄铁道学院学报,2004,17(Z1):96-98.[2]熊亮.铁路工程变更索赔技巧[J].铁道建筑技术,2010(11):102-103.[3]罗文龙.铁路工程前期筹划及施工阶段的成本管理[J].铁路工程造价管理,2010,25(6):39-41.[4]王吉祥.工程项目成本管理过程绩效考核的实践[J].建筑经济,2006(7):94-95.建筑经济,2013(11):22-24