工期与费用分别优化的实例研究
胡白香 任鹏 姚彬 滕斌 蔡东升
(1.江苏大学土木工程与力学学院, 江苏 镇江 212013; 2.宁安铁路工程第五项目分部, 安徽 芜湖 241000;3.江苏金土木建设集团有限公司, 江苏 常熟 215500)
文献要素
[摘 要] 运用传统方法进行工期-费用优化可以得到最优解,但工期与费用同时进行优化,其计算量很大,而启发式算法及各类智能算法能减小计算量,但不能保证是最优解。依据所分析的结合循环法与动态规划法的工期-费用优化原理,以青弋江特大四线客运专线桥1号块为研究对象,将工期与费用分别进行优化。
[关键词] 工期优化;费用优化;循环法;动态规划法;优化分析
Abstract: Duration and cost optimization for construction can get the optimal solution by using traditional methods, but need duration and cost optimization at the same time, a lot of calculation. Heuristic algorithm and various intelligent algorithms can reduce the amount of calculation, but can't guarantee to be the optimal solution. The principle of duration and cost optimization was analyzed from the cycle method and dynamic programming method. Based on the principle, duration and cost was optimized separately with the 1st block of Qingyi river bridge of large four-wire passenger as research object.
Key words: duration optimization; cost optimization; cycle method; dynamic programming method; optimization analysis
[参考文献]
[1]JGJ/T 121-1999工程网络计划技术规程[S].北京:中国建筑工业出版社,1999.
[2]成虎,陈群.工程项目管理[M].北京:中国建筑工业出版社,2009.
[3]胡华选.网络计划工期费用优化及其蚁群算法[D].大连:大连理工大学,2007.
[4]Rifat Sonmez. A hybrid genetic algorithm for the discrete time-cost trade-off problem[J]. Expert Systems with Applications,2012,39(13).
[5]孙伟峰,董福全,苏会德.网络计划工期优化在工程进度管理中的应用[J].山东冶金,2011,33(2).
[6]张宏斌.运筹学方法及其应用[M].北京:清华大学出版社,2008.
建筑经济,2013(10):43-46
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!