国际工程合同索赔与变更优化
吕奎 汪小康 吕锋
(1.中国地质大学工程学院, 湖北 武汉 430074;2.中南财经政法大学经济学院, 湖北 武汉 430060;3.中国土木工程集团有限公司, 北京 100038)
文献要素
[摘 要] 通过分析尼日利亚阿卡铁路项目实际发生的两起合同验工条款索赔和两个优化设计变更的成功案例,总结合同索赔和设计变更的过程和取得的成果,分析总价合同和单价合同采用不同的处理方式,阐述合同索赔和设计变更时与咨询工程师或业主谈判的技巧,最后提出索赔和变更取得成功的重要条件,即紧抓合同,实现互利共赢。
[关键词] 国际工程;合同索赔;变更优化
Abstract: Based on the successful cases-two claims for the contract clauses of the measurement of work executed and two design variations optimization actually occurred in the Nigerian Railway Modernization Project, this paper summarizes the process and accomplishments of contract claims and design variations, analyzes the different treatments adopted for both lump-sum contract and unit price contract; states the negotiation skills for the project's employer or the consultant regarding to the contract claims and design variations. At last, the important conditions of the success for the claims and variations are put forward -basing on the contract tight to occupy the commanding point of the theory, following the strategy of mutual benefit and win-win results to create better benefit for the project.
Key words: international project; claim; design variation
[参考文献]
[1]吕文学.国际工程承包[M].北京:中国建筑工业出版社,2008.
[2]吴亚卓.国际工程承包中的企业索赔管理[J].建筑经济,2010(9):70-73.
[3]叶萍.FIDIC合同在国际工程索赔管理中的应用[J].建筑经济,2008(9):92-94.
[4]王金龙.浅谈国际总承包工程索赔与反索赔[J].现代商业,2012(6):177.
[5]张晓伟.建筑工程施工索赔的关键和技巧[J].福建建筑,2011(4):94-95.
建筑经济,2013(4):38-41
 

 

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!