施工合同变更的体系化解说—兼论工程变更
汪明纲
(1.江苏天元房地产土地与资产评估造价有限公司,江苏 南京 210009;2.江苏东南律师事务所,江苏 南京 210029)
文献要素
[摘 要] 合同法与学说及实务对工程变更的观点不尽一致。为探析工程变更的含义及其与施工合同变更的关系,通过相关概念整理及学术观点分析,提出工程变更是施工合同变更的原因之一,并深入分析施工合同变更的原因、构成要件及法律效果。依此分析可判断工程上的变动是否构成施工合同变更。
[关键词] 施工合同;工程变更;构成要件
Abstract:  The rules of the engineering change in Contract law are not congruent with the theory and practice of that. In order to explore the relationship between the engineering change and construction contract, this paper, through arranging and analyzing the relevant concepts and academic views, puts forward that the engineering change is one of the causes of construction contract change, and then analyzes deep the causes of construction contract change, constitutive requirements and legal effect, which can determine the engineering whether results in the change of construction contract.
Key words:  construction contract; engineering change; constitutive requirement
建筑经济,2013(3):58-61
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!