您现在的位置:建筑经济>>往期回顾>2013年>第3期>>文献要素
工程项目流水施工网络计划特殊问题实证研究
李岚
(东北财经大学投资工程管理学院工程管理研究中心,辽宁 大连 116025)
文献要素
[摘 要] 工程项目流水施工是一种常用和有效的施工组织方式,一般分为有节奏流水施工和无节奏流水施工。在概括总结两种流水施工特点的基础上,重点阐述无节奏流水施工进度计划横道图各相邻施工过程流水步距的理论计算,特别是在其网络计算时需要处理的特殊问题。最后通过实证研究,得出结论:凡是流水步距不等的流水施工,必须将流水步距以虚拟工作的形式引入网络计算的逻辑关系。
[关键词] 流水施工;流水节拍;流水步距;网络计划
Abstract: The project flow construction is a usually and effective construction organizing manner, it is classified as rhythmic flow construction and unregular flow construction. Based on summarizing the characteristic of the two kinds of flow construction, expounds the theoretical calculating of the flowline pace of each near process of construction schedule horizontal line graph of unregular flow construction. Especially, discusses the exceptive problem as network program calculating. Finally, has instancing researched and given the conclusion that all flow construction with unequal flowline pace must take the flowline pace as virtual work,and introduce it into logic relation of network diagram.
Key words: flow construction; frequency of continuous construction; flowline pace; network plan
建筑经济,2013(3):35-38
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!