您现在的位置:建筑经济>>往期回顾>2013年>第2期>>文献要素
基于ISM的国际PPP项目风险因素相互影响分析
张晓兵 张小富
(安阳师范学院建筑工程学院,河南 安阳 455002)
文献要素
[摘 要] 首先建立了一个包含20个风险因素的国际PPP项目风险系统,然后采用解释结构模型(ISM)分析法对这一系统进行分析,建立了一个能够清晰描述各个风险间影响关系的风险系统结构模型,并指出项目参与方在实际风险管理中不同阶层应该着重关注的风险因素。
[关键词] 公私合营项目;解释结构模型;风险因素;系统结构分析
Abstract:  In this article, a risk system of international PPP project containing 20 risk factors is set up firstly, and then interpretative structural modeling(ISM) analysis method is used to analyze the system above. According to the research, a risk system structural model which focuses on the relations among all the 20 risk factors, especially on the hierarchy of them is established. At the end of this article, the risks worth noting particularly for project participators during different phases are pointed out based on the findings when considering both direct and indirect relationships.
Key words: Public and Private Project (PPP); Interpretative Structural Modeling (ISM); risk factor; system structural analysis
[参考文献]
[1]Shou Qing Wang. Risk management framework for construction projects in developing countries [J]. Construction Management and Economic,  2003,  2(3):237-252.
[2]霍丽伟. PPP项目的风险分析与对策研究[D].重庆:重庆大学,2010.
[3]A. Ng, Martin Loosemore. Risk allocation in the private provision of public infrastructure[J]. International Journal of Project Management, 2007(25): 66-67.
[4]王众托. 系统工程引论[M].北京:电子工业出版社,2006:79-111.
[5]Bing Li. Risk management of construction public private partnership projects[D]. Australia: Glasgow Caledonian University,  2003.   
[6]孙艳丽,刘万博,刘欣蓉. 基于ISM的PPP融资风险因素分析[J]. 沈阳建筑大学学报:社会科学版, 2012(1):41-44.
建筑经济,2013(2):38-41
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!