国际工程中基准计划的编制
(1. 中建股份海外事业部, 北京 100125;2. 中国电子工程设计院, 北京 100840)
- 文献要素
-
[摘 要] 在国际工程总承包项目中,基准计划在工程监控和后期工期索赔中居于基础和中心地位。本文基于在中东地区多年的计划合约管理实践经验,以建筑工程为例,对于基准计划的编制过程和编制要点进行阐述。[关键词] 国际工程,基准计划,编制,工期索赔Abstract: In the international projects, baseline program plays a basic and center role in monitoring site progress and EOT claim. Based on the experiences of projects in the Middle East region, this paper illustrates the preparing procedure and preparing key points of baseline plan in the construction engineering for example.Key words: international project, baseline plan, preparing, EOT claim[参考文献][1]FIDIC.Condition of contract for construction[S].1999.[2]Reg.Thomas.Construction contract claims[M].London:Palgrave Macmillan,2001.[3]Planning and control guide[J].Primavera Project Planner,1999.[4]Delay and disruption protocol[Z].Society of Construction Law,2002.建筑经济,2012(8):39-41