国内EPC模式联营体总承包商关键风险因素研究
(1.中国建筑西南设计研究院有限公司, 四川 成都 610041;2.西南交通大学, 四川 成都 610031)
- 文献要素
-
[摘 要] EPC总承包模式在国内逐渐推广运用,但是以联营体作为总承包商的EPC模式工程项目存在着很多不确定性。在查阅大量文献的基础上,结合专家访谈,对影响国内EPC联营体总承包商的风险因素进行系统分析研究,建立EPC模式联营体总承包商主要风险因素模型,为有效把握EPC模式工程项目的关键风险提供参考。[关键词] EPC模式,风险因素,问卷,因子分析Abstract: EPC mode uses joint venture as owner, puts into widespread application gradually, but there are many shortcomings of it. After looking up a large amount of related literature, this paper carried out a systematical analysis of risks of EPC mode for joint owner, and establishes a risk mode, with the purpose of play a guidance role model for effective to grasp the crucial risks of the EPC model projects.Key words: EPC mode; risk factor; questionnaire; factor analysis[参考文献][1]Sui Pheng Low,Junying Liu,Sarah He. External risk management practices of Chinese construction firms in singapore[J]. KSCE Journal of Civil Engineering,2009,13(2):85-95.[2]Ning Yu, Yanfeng Wang. Risk analysis of EPC project based on ISM[J]. Emergency Management and Management[3]陈志华,于海丰.EPC总承包项目风险管理研究[J].电力学报,2006,21(4).[4]杨晓明,周栩.EPC工程总承包项目风险模糊综合评价[J].华北水利水电学院学报,2008,29(5).[5]楼海军.国际EPC工程风险分担原则研究[J].混凝土与水泥制品,2010(4).建筑经济,2012(7):65-67