- 文献要素
-
[摘 要] 基于模糊数学的分析方法建立城市隧道施工风险分析模型,以专家问卷和相关规范为基础资料,并结合胶州湾隧道青岛端接线工程施工状况,对模型进行验证分析表明,该模型对于分析隧道施工风险是可行的。
[关键词] 城市隧道,施工风险,层次分析,模糊评估,风险控制
Abstract: Based on the analytical approach of fuzzy mathematics, this paper establishes the analysis model of urban tunnel construction risk. With the example of Jiaozhou bay sub-sea tunnel connecting engineering construction, and with expert questionnaire and related specifications as basic data, validating analysis shows that this model is applicable for tunnel construction risk analysis.
Key words: urban tunnel; construction risk; analytical hierarchy process; fuzzy analysis; risk control
[参考文献]
[1]Einstein H., Chiaverio F., Koepel U. Risk analysis for the Adler tunnel[J]. Tunnels & Tunnelling International, 1994,26(11):28-30.
[2]Snel A.J.M., Van Hasselt D.R.S. Risk management in the Amsterdam North/South Metro line: A matter of progress communication instead of calculation[C]. Proceedings of the world tunnel congress 99,1999:179-186.
[3]Clark G.T., Borst A. Addressing risk in Seattles' underground[J]. PB Network,2002(1):34-37.
[4]B.Nilsen, A.Palmstrom, H.Stille. Quality control of a sub-sea tunnel in complex ground conditions[J]. Challenges for the 21st century,1992:137-145.
[5]王梦恕,张成平.城市地下工程建设的事故树分析及控 制对策[J].建筑科学与工程学报,2008,25(2):1-6.
[6]易小明,张顶立,陈卫忠.基于DSC模型的房屋开裂评估与监测分析[J].岩土力学,2010,31(3):832-838.
[7]肖同刚.隧道软弱围岩-支护系统安全性分析评价及其工程应用[D].上海:同济大学,2007.
建筑经济,2012(4):88-92