核电站建造现场签证及零星委托管理方式探讨
(中国核电工程有限公司, 北京 100840)
- 文献要素
-
[摘 要] 从工程实际出发,探讨工程现场签证、零星委托的有效管理方法,并以某核电站核岛安装承包商现场签证及零星委托的管理为例进行相关实证研究,为解决目前核电站建设项目的现场签证及零星委托的管理提出可资借鉴的管理方法。[关键词] 核电站项目,现场签证,零星委托,造价管理Abstract: This paper explores the effective management method of the construction site visa and sporadic commission from the view of engineering practice, does some analysis with the related example about the management on site visa and sporadic commission of a nuclear power plant installation. All these provide a management method which can be used for reference to solve the current project site visa and sporadic commission management in nuclear power plant construction.Key words: nuclear power plant project; site visa; sporadic commission; cost management[参考文献][1]杨希琴.建设项目设计变更与现场签证管理对策研究[J]. 建筑设计管理,2010(1).[2]杨晴.加强现场签证管理有效控制工程造价[J].山西建筑,2011(4).[3]刘达颖.关于现场签证的浅析[J].广东建材,2009(4).[4]龚舒静.工程结算价款的有效控制[J].中外企业家,2009(8):139-140.建筑经济,2012(3):38-40