FIDIC合同条件下国际工程投标报价分析
(西南石油大学土木工程与建筑学院, 四川 成都 610500)
- 文献要素
-
[摘 要] 国际工程投标报价决定了承包商报价的水平以及中标后的盈利水平。本文论述了FIDIC合同条件下工程项目的实物报价方法,着重介绍了实物法投标报价的准备工作和计算分析,并提出以实物法为准、修正定额法与实物法结合的投标报价建议。[关键词] FIDIC合同条件,国际工程,投标报价,实物法Abstract: Bid quote of engineering determines the bidding level and profitabity after acceptance of bid. The paper expounds the preparation work and analyzing of real object method under FIDIC contract conditions, and proposals the bidding method should be mainly based on real object method, fix quota method and real method combined.Key words: FIDIC contract conditions; international engineering; bid quote; real object method建筑经济,2012(2):31-32