投标报价中材料定额消耗量异常变动的处理
杨秀英
(中国五冶集团有限公司, 四川 成都 610063)
文献要素

[摘 要] 施工招标中少数投标人违规变动材料定额消耗量,给评标、施工合同签署、合同履行与计价结算造成障碍。本文基于案例分析,探讨如何正确认识与恰当处理投标报价中材料定额消耗量的异常变动。
[关键词] 投标报价,定额消耗量,异常变动,处理
Abstract: Except regulation adjustment and conversion, the standard of valuation quota consumption can't normally be changed by consumption of labor work, material, equipment cost in specific projects. In construction invite bids, a small number of tenderers break the rule to change the fixed material quota consumption. This abnormal change will bring inconvenience to tender evaluation, construction contract sign-up, contract implementation and valuation final payment. This paper discusses how to correctly realize and solve abnormal change on fixed material quota consumption in tender offer through a specific example.
Key words: tender offer; fixed material quota consumption; abnormal change; operation
建筑经济,2011(12):73-75