国际工程进度款结算问题探讨
王凯 郭彬 闫金兵
(1.中国水电建设集团港航建设有限公司, 天津 300457;2.中国水利电力对外公司, 北京 100011;3.天津市水务局, 天津 300074)
文献要素
[摘 要] 国际工程进度款结算时,在双币种支付的情况下,由于合同固定汇率与结算实际汇率不同,在合同允许的范围内,采用不同的扣除预付款方式会有不同的结算结果。本文通过结算的计算与比较分析,为我国工程承包商在国际工程业务中如何取得结算最优化提供思路。
[关键词] 国际工程,进度款,双币种支付,汇率,预付款
Abstract: In international project, if the interim payment is made in dual-currencies by the employer to the contractor, because of the difference between rate of exchange of contract and the instant rate of exchange when the interim payment is made, under the conditions of the contract, in the event of using different ways to repay the advance payment, the amount of the interim payment shall be different. Through the comparison analysis and the calculation of the interim payment, this paper provides the payment optimizing method for the contractors doing the international projects.
Key words: international project; interim payment; dual-currencies; rate of exchange; advance payment
[参考文献]
[1]李莉华.国际工程结算的风险分析及应用[J].河南水利,2006(12).
建筑经济,2011(10):32-34
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!