大型工程前期决策综合集成管理模式研究—港珠澳大桥建设管理理论思考
(南京大学工程管理学院, 江苏 南京 210093)
- 文献要素
-
[摘 要] 对大型工程前期决策系统复杂性进行分析,并在此基础上研究由群体集成、过程集成与知识集成构成的大型工程综合集成管理三维框架体系。结合港珠澳大桥前期决策的综合集成管理实践,对大型工程前期决策综合集成管理模式做具体阐释,为我国大型工程前期决策复杂性管理提供借鉴。[关键词] 大型工程,前期决策,综合集成管理Abstract: Analyzes the complexity of early decision-making system of the large-scale construction project, and researches on the three-dimensional system consisting of group integration, process integration and knowledge integration based on this analysis. According to the meta-synthesis management practice of the HongKong-Zhuhai-Macao Bridge, concretely explains the meta-synthesis management model of large-scale construction project's early stage decision-making. It can provide conferences for the complexity management of large-scale construction project's early stage decision-making.Key words: large-scale construction; early stage decision-making; meta-synthesis management[参考文献][1]王茜,程书萍.大型工程的系统复杂性研究[J].科学决策,2009(1):11-17.[2]盛昭瀚,游庆仲.综合集成管理:方法论与范式——苏通大桥工程管理理论的探索[J].复杂系统与复杂性科学, 2007,4(2):1-9.[3]于景元.钱学森综合集成体系[J].西安交通大学学报(社会科学版),2006,26(6):40-47.[4]盛昭瀚,游庆仲,李迁.大型复杂工程管理的方法论和方法:综合集成管理[J].科技进步与对策,2008,25(10):193-197.[5]于景元,关于综合集成的研究——方法、理论、技术、工程[J].交通运输系统工程与信息,2005,5(2):5-10.[6]盛昭瀚.大型工程综合集成管理[M].北京:科学出版社,2009.[7]盛昭瀚.大型复杂工程综合集成管理模式初探[J].建筑经济,2009,32(5):4-9.建筑经济,2011(8):44-47