海心沙工程的总体进度控制新方法
(1.广州市建设集团有限公司, 广州 510030,2.华北电力大学, 北京 102206)
- 文献要素
-
[摘 要] 在简述海心沙工程特点及其工程进度要求的基础上,工程项目部就该工程进度的总体调控制定实施了细化所有施工工序,统筹编制项目总体进度网络控制图等五项措施,为今后类似工程项目提供了参考范例。[关键词] 亚运工程,工程进度,总体调控Abstract: Based on the characteristics and the progress requirements of Haixinsha engineering, the project department launches five measures such as refining all construction process and coordinating the network control chart of overall project schedule to provide a reference example for the similar projects.Key words: Asian Games project, schedule, overall control[参考文献][1]席群峰.对政府投资重大群体项目管理与控制方法的思考[J].建筑技术,2010(4):294-300.[2]Hou Xueliang. Optimization and distribution about engineering resources[J]. Journal of Construcion Technical Development,2006,33(3):124-127.[3]钟登华,任炳昱,李明超,等.高拱坝施工质量与进度实时控制理论及应用[J].中国科学,2010(12):1389-1397.[4]Kenji K, Kazuyoshi E,Satoru I, et al. The application of PDA as mobile computing system on construction management[J]. Autom Construct,2005(14):500-511.建筑经济,2011(6):9-11