您现在的位置:建筑经济>>往期回顾>2011年>第4期>>文献要素
PPP项目风险分担研究评述
杜亚灵 尹贻林
(天津理工大学管理学院, 天津 300384)
文献要素
[摘 要] 通过整理和分析大量文献,界定风险分担的概念并对该领域研究进行详细的归类阐释,从中提炼出PPP项目风险分担的三种基本研究路径:理论推演、理论应用和实践总结,得出PPP项目风险分担研究具有三个薄弱环节,即风险分担的过程评价、风险分担比例的确定以及风险分担与其他方面的关联关系,从而指出该领域未来的研究方向。
[关键词] PPP项目,风险分担,合同,研究路径
Abstract: The concept of risk allocation is defined and relevant researches are classified and analyzed through a thorough literature review. Then three basic research paths of risk allocation are extracted form it, i.e. theoretical deduction, theory application and practice summary. At last, three shortcomings in these researches are pointed out: the process evaluation of risk allocation, the determination of the risk allocation proportion between the public and the private and the relationship between the risk allocation and the other factors. All of them are the developing tendency of this field.
Key words: public-private partnership(PPP); risk allocation(RA); contract; research path
[参考文献]
[1]周春燕.PPP项目动态集成化风险管理研究[D].重庆:重庆大学,2009.
[2]Levitt R.E,Ashley D.B,Logcher R.D. Allocating risk and incentive in construction [J]. Journal of the Construction Division. ASCE,CO3,1980.
[3]Hoffman S L. The law and business of international project finance-a resource for governments, sponsors, lenders, lawyer sand project participants [M]. The Hague: Kluwer Law International,1998.
[4]United Nations Institute for Training and Research(UNITAR). PPP for sustainable development[R]. New York,2000.
[5]Clifton C, Duffield C F. Improved PFI/PPP service outcomes through the integration of alliance principles[J]. International Journal of Project Management,2006,24(7): 573-586.
[6]赵国富,王守清. 城市基础设施BOT/PPP项目社会评价方法研究[J].建筑经济,2006(s2):113-116.
[7]Uff J. Risk management and procurement in construction[M].London:Centre of Construction Law and Management,1995.
[8]巨鹏.基于信息费用的PPP/BOT项目风险分配研究[D].北京:清华大学,2008.
[9]Mills A. A systematic approach to risk management for construction[J]. Structural Survey,2001,19(5):245-252.
[10]Siebert H. Risk allocation in large-scale resource ventures [J]. KYKLOS,1987,40(4):476-495.
[11]M.P.Abednego,Stephen O.Ogunlana. Good project governance for proper risk allocation in public-private partnership in Indonesia[J]. International Journal of Project Management,2006(24):622-634.
[12]HM, Treasury. Private opportunity, public benefit:progressing the private finance initiative[M]. London:The Stationery Office,1995.
[13]刘新平,王守清.试论PPP项目的风险分配原则和框架[J].建筑经济,2006(2):59-63.
[14]柯永建,王守清,陈炳泉.基础设施PPP项目的风险分担[J].建筑经济,2008(4):31-35.
[15]严玲,赵华.项目所有权配置下代建项目风险分担机制研究[J].武汉理工大学学报(信息与管理工程版),2009,31(1):121-125.
[16]J.H.M.TAH, V.CARR. A proposal for construction project risk assessment using fuzzy logic[J]. Construction Management and Economics,2000(18):491-500.
[17]Lam P T I. A sectoral review of risks associated with major infrastructure projects[J]. International Journal of Project Management,1999,17(2):77-87.
[18]Wang S Q, Tiong R L K, Ting S K, etc. Evaluation and management of political risks in China's BOT projects [J].Journal of Construction Engineering and Management, 2000,126(3):242-250.
[19]Obaid S A. Assessment of risk allocation in construction projects[D]. Chicago: Illinois Institute of Technology,2001.
[20]Dias,A.Jr, P.G.Ioannou. Company and project evaluation model for privately promoted infrastructure projects[J]. Journal of Construction Engineering and Management,1996,122(1):71.
[21]李胜,张星,孙建平.BOT项目风险的模糊综合评价[J].上海经济研究,2004(10):69-73.
[22]何伯森,万彩芸.BOT项目的风险分担与合同管理[J].中国港湾建设,2001(5):63-66.
[23]邓小鹏,李启明,汪文雄,等.PPP模式风险分担原则综述及运用[J].建筑经济,2008(9):32-35.[24]K.C. Lam, D. Wang, Patricia T.K. Lee, Y.T. Tsang. Modelling risk allocation decision in construction contracts[J]. International Journal of Project Management,2007,25(5):485-493.
[25]Loosemore M, Raftery J, Reilly C, Higgon D. Risk management in projects [M].London:Taylor & Francis,2006.
[26]张水波,何伯森.工程项目合同双方风险分担问题的探讨[J].天津大学学报(社会科学版),2003,5(3):257-261.
[27]廖美薇.建设项目的风险管理:理论与应用[Z].香港:香港大学内部讲义,2000.[28]Vega Arturo O. Risk allocation in infrastructure financing [J].Journal of Project Finance, 1997, 3(2):38-42.
[29]Li Bing, A. Akintoye, P.J. Edwards, C. Hardcastle. The allocation of risk in PPP/PFI construction projects in the UK[J]. International Journal of Project Management, 2005,23(1):25-35.
[30]Roozbeh Kangari. Risk management perceptions and trends of U.S. construction[J]. Journal of Construction Engineering and Management,1995(12):442-449.
[31]杨卫华.基于风险分担的高速公路BOT项目特许定价研究[D].大连:大连理工大学,2007.[32]Zhang X Q, Kumaraswamy M M, Zheng W. Concessionaire selection for Build-Operate-Transfer tunnel projects in Hong Kong[J]. Journal of Construction Engineering and Management,2002,128(2):155-163.
[33]柯永建,王守清,陈炳泉.英法海峡隧道的失败对PPP项目风险分担的启示[J].土木工程学报,2008,41(12):97-102.
[34]姜兴国,张尚.工程合同风险管理理论与实务[M].北京:中国建筑工业出版社,2009:27-37.
[35]Ronsen, Oddvar Sten. Requirements of successful public private partnership projects-risk allocation between the private and public sectors[C]. Moscow: Seminar Public Private Partnerships(PPP)-Global Experience and Challenges in Russia,2005.[36]吴艳霞,王雷,殷仲民.基于投资方角度的项目融资风险分配研究[J].重庆建筑大学学报,2006,28(2):115-119.
[37]亓霞,柯永建,王守清.基于案例的中国PPP项目的主要风险因素分析[J].中国软科学,2009(5):107-113.
[38]杨秋波,侯晓文.PPP模式风险分担框架的改进研究[J].项目管理技术,2008,6(8):13-17.
[39]范小军,赵一,钟根元.基础项目融资风险的分担比例研究[J].管理工程学报,2007,21(1):98-101.[40]Frederick A.Entrepreneurial risk allocation in public-private infrastructure provision in South Africa [J]. South African Journal of Business Management,2002,33(4):29-40.
[41]朱宗乾,李艳霞,罗阿维,等.ERP项目实施中风险分担影响因素的实证研究[J].工业工程与管理,2010,15(2):98-102.
[42]Dennis F. Turner, Alan Turner. Building contract claims & disputes [M]. Harlow, Essex: Longman,1999:14.
[43]Lucy C. Recent trends in private financing of public infrastructure projects in South Africa[M]. South Africa: CSIR Building and Construction Technology,2001.[44]王颖.FIDIC红皮书与银皮书的风险分配比较[J].国际经济合作,2003(5):44-47.
[45]尹贻林,杜亚灵.基于治理的公共项目管理绩效改善[M].北京:科学出版社,2010:215-217.
[46]Oudot JM. Risk-allocation: theoretical and empirical evidences,application to public-private partnerships in the defense sector[C]//Barcelona,Spain: The 9th annual conference of the institutions of market exchange,2005.
[47]叶晓甦,吴书霞,单雪芹.我国PPP项目合作中的利益关系及分配方式研究[J].科技进步与对策,2010,27(19):36-39.
建筑经济,2011(4)29-34
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!