模块化集成建筑供应业务模式比较研究——基于模块供应单位视角
(1.深圳大学土木与交通工程学院,广东 深圳 518000;2.中建海龙科技有限公司,广东 深圳 518000)
- 文献要素
-
摘要:模块化集成建筑MiC作为工业化建筑的核心生产力,其供应模式直接影响了模块化建筑项目的生命线。针对当前市场缺乏明确MiC供应业务模式的问题,本文以模块化建筑项目全生命周期为脉络,系统分析模块供应单位仅供货、供货加安装、全流程三种供应模式的核心特征。通过对比三种模式在各生命周期阶段的模块供应单位责任及优劣势,分析了不同模式的适用场景。研究结果可为未来模块化建筑项目模式选择提供技术参考。关键词:模块化集成建筑;全生命周期;供应业务模式;优劣势对比Abstract:Modular Integrated Construction(MiC)is the core production in industrialized construction,the supply mode directly affects the lifeline of modular construction projects. To address the lack of clear supply business models for MiC in the current market,this study takes the whole life cycle of modular construction projects as the thread,and systematically analyzes the core characteristics of three supply models for modular suppliers:supply-only,supply plus installation,and full-process. By comparing the responsibilities,advantages,and disadvantages of modular suppliers under the three models at each life cycle stage,the study identifies the applicable scenarios for each model. The analysis results can provide technical reference for the selection of models in future modular construction projects.Keywords:modular integrated construction;whole life cycle;supply mode;strengths and weaknesses comparison参考文献[1] 岳清瑞,吴朝昀,刘晓刚,等.多高层模块化结构及建造技术研究进展与未来趋势[J].建筑结构学报,2024(8):1-19.[2] CUI Dingyue,ZHAO Huayang,ZHANG Ruijun. Approaching zero-carbon development through modular construction:A case study of healthcare buildings in London[J].Indoor and Built Environment,2025(7):1404-1421.[3] 李英达.关系嵌入与工程总承包项目跨组织资源协奏——基于制度逻辑视角的多案例研究[D].大连:大连理工大学,2023.[4] Zhong X,Chen H,Zhang M,et al. Structural systems for modular integrated construction:Review and comparative analyses[J]. Advances in Structural Engineering,2025(11):1927-1944.[5] 常安果.基于四部融合的EPC项目设计管理探讨[J].建筑经济,2025(6):34-37.[6] 段瀚,宣勇,曾思博.以建筑机器人为新质生产力的工程价值链建构研究[J].建筑经济,2026(4):16-25.[7] 李希杰.建筑工程项目管理中的施工管理与优化策略研究[J].河海大学学报(自然科学版),2021(6):591-592.[8] 阮庄稼,刘慷,胡益凡,等.基于熵权-DEMATEL法的机场不停航施工风险分析[J].建筑经济,2025(6):26-33.建筑经济,2026(11):46-52
