工程结算审核质量提升方法研究
(安能集团二局电力建设发展(厦门)有限公司,福建 厦门 361000)
- 文献要素
-
摘要:工程结算审核作为建设工程全生命周期造价控制的关键环节,其核心工作是通过对承包方报送的结算文件进行全面查证、对比与复核,纠正计量计价偏差,确保工程造价的真实性与合理性。基于行业实践经验,从规范资料管理、明确审核依据、优化审核流程、创新审核方法、完善沟通机制等方面,系统提出工程结算审核质量的提升路径,以期为造价从业人员优化审核工作、降低结算风险提供参考。关键词:工程结算;审核质量;方法;造价管理Abstract:As a key link in the whole-lifecycle cost control of construction projects,the engineering settlement audit focuses on verifying,comparing and reviewing the settlement documents submitted by contractors,correcting measurement and pricing deviations,and ensuring the authenticity and rationality of the project cost. Based on practical industry experience,this paper systematically proposes pathways for improving the quality of engineering settlement audits from several aspects,including standardizing document management,clarifying audit criteria,optimizing audit procedures,innovating audit methods,and improving communication mechanisms. It aims to provide references for cost practitioners to optimize audit work and reduce settlement risks.Keywords:engineering settlement;audit quality;method;cost management参考文献[1] 谌小燕.建设工程造价结算审核方法探析[J].现代经济信息,2017(11):354-356.[2] 王秀红.浅谈如何提高工程结算审核质量[J].中小企业管理与科技(下旬刊),2011(6):60.[3] 王榕.建设方工程结算问题与对策探讨[J].建筑经济,2025(12):31-36.[4] 李新祥.关于工程结算审核准确性的探讨[J].工程造价管理,2013(6):34-36.[5] 杭雯.工程结算必须重点把好两道关[J].铁路工程造价管理,1999(4):33-34.[6] 郭丽辉.从实例工程看工程量清单计价模式下的工程结算审核[J].工程造价管理,2010(5):34-36.[7] 刘东.工程建设项目预结算审计存在的问题及改进措施[J].铁路工程技术与经济,2024(6):57-60.[8] 周冬冬.建设工程竣工结算时效性影响因素及提升建议[J].建筑经济,2024(11):14-19.[9] 彭桂平,朱晓枫,潘建锋,等.工程总承包项目合同结算主要难点及处理建议[J].建筑经济,2025(9):21-23.建筑经济,2026(8):91-96
