您现在的位置:建筑经济>>往期回顾>2026年>第5期>>文献要素
工程招投标投诉时效把握与实践应用
胡修勇
(宁波市北仑区建筑市场管理服务站,浙江 宁波 315800)
文献要素
摘要:根据投诉时效决定是否受理工程招投标的投诉,需正确适用法律依据,并准确认定起算时间“知道”或者“应当知道”之日。目前对投诉时效的规定并不严格,实践中有必要弱化“投诉时效”的概念。起算时间因实际投诉情况而异,无统一时间,应根据不同情况和相关证据通过论证确定。实践中存在未严格论证投诉时效起算时间即决定不予受理投诉的做法,争议较大,有被复议和诉讼的风险。
关键词:工程法律;投诉;投诉时效;实践
Abstract:Whether to accept complaints regarding engineering bidding is determined based on the statute of time limitations for complaints. It requires the correct application of legal provisions and accurate determination of the starting point,which is the date when the complainant "knew" or "should have known." Currently,the regulations on the statute of time limitations for complaints are not strict,and it is necessary to weaken the concept of Complaint Time Limit in practice. The starting point varies depending on the actual circumstances of the complaint and lacks a unified standard. It should be determined through argumentation based on different situations and relevant evidence. In practice,there are instances where the statute of time limitations for complaints is not rigorously examined before deciding to reject the complaint,leading to significant disputes and risks of reconsideration or litigation.
Keywords:engineering law;complaint;complaint time limit;practice
参考文献
[1] 高国民,辛超.工程项目与货物采购招标异议投诉之时效探究[J].中国招标,2017(4).
[2] 蒙建波,王光曦.“两法”对投诉规定的异同及现实处理[J].中国招标,2020(12).
[3] 麻昌华,陈明芳.《民法典》中“应当知道”的规范本质与认定标准[J].政法论丛,2021(4).
[4] 张继成.对“知道”“应当知道”“明知”及其关联概念的法逻辑诠释[J].法学,2023(6).
[5] 翟翌,刘杰.起诉期限起算点的厘定—对“知道或者应当知道行政行为内容”的实证研究[J].浙江大学学报(人文社会科学版),2023(9).
建筑经济,2026(5):62-67
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!