破解工程量清单漏项与现场签证困局:概念辨识、成因及对策
(1.广州大学城能源发展有限公司,广东 广州 510006;2.广州城投研究院有限公司,广东 广州 510000)
- 文献要素
-
摘要:工程量清单漏项与现场签证管理失控是导致工程建设投资超支的核心因素。本文通过界定工程量清单漏项、现场签证及工程变更的学理边界,构建“风险成因—影响机制—管控路径”三维分析框架,系统揭示漏项与签证引发的投资失控作用机理,并提出涵盖源头预防、过程规制、追溯考核的闭环管控体系,为业主实现精准投资管控提供理论支撑与实践方案。关键词:工程量清单漏项;现场签证;工程变更;投资控制Abstract:Omitted items in the Bill of Quantities(BOQ)and mismanagement of site visas are core factors leading to cost overruns in construction projects. This paper defined the theoretical boundaries of BOQ omissions,site visas,and engineering changes,constructed a three-dimensional analytical framework of "risk causation-impact mechanisms-control pathways",systematically revealed the mechanism through which omissions and site visas lead to cost overruns,and proposed a closed-loop management system covering source prevention,process regulation,and retrospective assessment. The paper provided theoretical support and practical solutions for owners to achieve precise investment control.Keywords:omissions items in the bill of quantities(BOQ);site visa;engineering change;investment control参考文献[1] 殷晓敏,刘金灿.基于发包人视角的政府投资项目工程总承包投资管控研究[J].建筑经济,2024(2):89-96.[2] 杨希琴.建设项目设计变更与现场签证管理对策研究[J].建筑设计管理,2010(1):14-16.建筑经济,2025(12):5-10
