基于AHP-DEMATEL的工程索赔管理对策研究
(云南省滇中引水工程有限公司,云南 昆明 650051)
- 文献要素
-
摘要:工程索赔是合同当事人因非自身原因遭受损失时向对方提出赔偿或补偿的重要手段,对维护权益、降低风险意义重大。通过文献研究和专家访谈识别影响因素,运用AHP-DEMATEL法对工程索赔的影响因素及其权重进行系统分析,确定了关键因素。研究指出,完善索赔证据、积极应对索赔事件、优化谈判策略、强化风险管理、打造专业团队、敏锐把握索赔机会、合理核算索赔诉求等策略,可有效提升索赔管理水平,保障合同执行,降低项目风险。关键词:工程索赔;AHP-DEMATEL法;关键因素;管理对策Abstract:Engineering claim is an important means for the parties to the contract to make compensation or compensation to the other party when they suffer losses for non-self-causes,which is of great significance for safeguarding rights and interests and reducing risks. This paper identifies the influencing factors through literature research and expert interviews,and uses the AHP-DEMATEL method to systematically analyze the influencing factors and their weights of engineering claim management,and determines the key factors. The research points out that timely filing of claim evidence,actively responding to claim events,optimizing negotiation strategies,strengthening risk management,building a professional team,keenly grasping claim opportunities,and reasonably calculating claim demands,can effectively improve the level of claim management,ensure contract execution,reduce project risks.Keywords:engineering claim;AHP-DEMATEL method;key factors;management countermeasures参考文献[1] 安子奇.建筑施工索赔关键成功因素及对策研究[D].北京:北京交通大学,2020.[2] 卢英鑫,刘福江.承包方工程索赔关键成功因素及提升对策研究[J].广西城镇建设,2024(5):78-82.[3] 杜庆艳.基于改进层次分析法的承包商索赔管理水平研究[D].沈阳:沈阳建筑大学,2017.建筑经济,2025(9):56-59